Skip to content
S&P 5007,743.98up +0.28%Nasdaq26,549.85up +0.27%Dow52,475.10up +0.19%DAX25,704.02up +0.44%GBP/USD1.3330up +0.17%EUR/GBP0.8370up +0.10%Brent110.28up +0.80%Gold4,091.9up +0.42%Bitcoin81,350up +0.68%Prices at 20:10
ChartsView
  1. Research
  2. Company trackers
  3. SpaceX

SpaceX tracker

Every SpaceX rocket, service and business and where each has got to, including the AI data centre build-out, plus the launch schedule, Starlink’s growth and the latest filings and news. Updated through the day from the company’s US filings and free public data.

SPCX Space Exploration Technologies Corp., listed on Nasdaq Updated 2 hours ago

Launches so far in 2026123170 in all of 2025
Next launch1d 7hFalcon 9, Starlink Group 15-18, 30 Oct, 04:02 UK time
Starlink subscribers12.0mAt 30 Jun 2026, in 167 countries and markets
AI data centre power1.4 GWAt 30 Jun 2026. Target: over 2 GW by December

Q3 2026 results

Published 20 Oct 2026. SpaceX beat what analysts expected on almost every measure: sales of $14.6bn against about $13bn forecast, and profit of 35 cents a share against 10 to 17 cents. All three businesses sold more than forecast, led by AI. The one soft spot was Starlink home subscribers, a little below one forecast. Against a year ago, sales are up 161% and a $1.1bn loss has turned into a $4.4bn profit.

Against what analysts expected

ExpectedActualResult
Sales$12.7–13.0bn$14.6bnBeat
Profit per share$0.10–0.17$0.35Beat
Underlying profit$6.6bn$8.8bnBeat
Operating profit$2.2bn$2.8bnBeat
AI sales$6.4–6.5bn$7.6bnBeat
Starlink sales$4.9bn$5.2bnBeat
Space sales$1.4–1.5bn$1.8bnBeat
Spending on factories and AI$19.6bn$19.6bnIn line
Cash left after spending−$11.6bn−$10.0bnBetter
Starlink subscribers14.3m13.6mMiss

Forecasts are analyst forecasts published before the results (Bloomberg, Benzinga, TipRanks, MarketBeat and other reports). They vary between providers, so a range is shown where they differ. The operating profit, cash and subscriber forecasts each come from a single report. Profit per share is as reported, not adjusted.

In brief

  • Sales of $14.6bn were well ahead of the $12.7–13.0bn analysts expected, and nearly double last quarter’s $7.8bn. Profit per share was 35 cents, against forecasts of 10 to 17 cents.
  • AI was the big driver. AI sales were $7.6bn against about $6.5bn expected, up from $2.6bn last quarter and $0.8bn a year ago. SpaceX puts this down to new deals renting out its AI data centres, buying Cursor (which added $608m from 14 Aug) and more use of Grok.
  • Operating profit was $2.8bn, against $2.2bn expected and a $143m loss last quarter. The AI business went from a $1.3bn loss last quarter to a $431m profit, even after $1.2bn of Cursor share awards.
  • Net profit was $4.4bn, against a $1.1bn loss a year ago. $1.2bn of that came from interest and other income (after paying interest on debt) and $390m from a tax credit.
  • Starlink sales rose 69% to $5.2bn, ahead of the $4.9bn forecast. Home subscribers rose by 1.6m in the quarter to 13.6m, though one forecast had about 14.3m. The average monthly bill was $69, against $83 a year ago.
  • Spending on factories and AI was $19.6bn, as expected and almost three times a year ago; $16.4bn of it was in the AI business. After that spending, SpaceX used about $10.0bn more cash than it brought in, less than the $11.6bn one forecast expected. It had $89.9bn in cash and investments at the end of September.
  • Space sales rose 6% to $1.8bn, ahead of the $1.4–1.5bn forecast, but launches fell to 35 from 44 a year ago. Starship flew its first revenue-earning mission, carrying 26 Starlink satellites. AI computing power reached 1.7 GW, up from 0.6 GW a year ago.

Against a year ago (Q3 2025)

Q3 2025Q3 2026Change
Sales$5.58bn$14.6bnup +161%
AI sales$813m$7.56bnup +830%
Starlink sales$3.10bn$5.25bnup +69%
Space sales$1.67bn$1.77bnup +6.1%
Margin on sales51.5%62.4%+10.9 pts
Running costs$3.14bn$6.31bnup +101%
Underlying profit$2.17bn$8.81bnup +306%
Spending on factories and AI$6.88bn$19.6bnup +185%
Starlink subscribers7.20m13.60mup +89%
Launches4435down −20%

Red and green show whether a change is good or bad for SpaceX, so more spending shows in red.

Sales

Sales by quarter
  1. $5.6bn
  2. $5.0bn
  3. $4.7bn
  4. $7.8bn
  5. $14.6bn

AI sales

AI sales by quarter
  1. $0.8bn
  2. $0.9bn
  3. $0.8bn
  4. $2.6bn
  5. $7.6bn

Starlink sales

Starlink sales by quarter
  1. $3.1bn
  2. $3.2bn
  3. $3.3bn
  4. $4.3bn
  5. $5.2bn

Underlying profit

Underlying profit by quarter
  1. $2.2bn
  2. $1.5bn
  3. $1.1bn
  4. $3.5bn
  5. $8.8bn

Spending on factories and AI

Spending on factories and AI by quarter
  1. $6.9bn
  2. $6.9bn
  3. $10.1bn
  4. $18.4bn
  5. $19.6bn

Starlink subscribers

Starlink subscribers by quarter
  1. 7.20m
  2. 8.90m
  3. 10.30m
  4. 12.00m
  5. 13.60m

Margin on sales is gross margin: what is left of each sale after the cost of providing it. Underlying profit is SpaceX’s adjusted EBITDA: profit before interest, tax, depreciation, share awards and one-off costs. Starlink subscribers are home and small-business users, not large company and government customers. Running costs are research, selling and admin costs. Cash left after spending is cash from the business minus spending on factories and AI; SpaceX does not publish it, so it is worked out from its cash flow figures. Q4 2025 and Q1 2026 come from SpaceX’s June 2026 share sale document. SpaceX now calls its AI business ‘Super Intelligence’. SpaceX Q3 2026 results release, 20 Oct 2026

Products and progress

Where each SpaceX product has got to, from first announcement to widely available. Checked against SpaceX’s Q2 2026 report to the SEC (4 Aug 2026), Musk’s posts on X and Launch Library launch records.

Rockets

  1. Falcon 9 Widely available

    Flies most SpaceX missions

    Reusable rocket: the first stage lands and flies again. 37 Falcon launches in Q2 2026, against 45 a year earlier. SpaceX Q2 2026 report

  2. Falcon Heavy Widely available

    For the heaviest loads

    Three Falcon 9 cores side by side. Latest flight: NROL-97 on 2 Oct 2026. Launch Library

  3. Dragon Widely available

    Flies astronauts and cargo

    Capsule that serves the International Space Station. Crew-13 launched on 1 Oct 2026. Launch Library

  4. Starship Testing

    Test flights

    The giant, fully reusable rocket. Flight 14 (28 Sep 2026) carried Starlink satellites. So far it has only flown SpaceX’s own payloads. SpaceX Q2 2026 report

  5. Starship Moon lander In development

    In development for NASA

    The version of Starship chosen in Apr 2021 to land NASA astronauts on the Moon. Launch Library lists a test in Earth orbit for 2027, with no firm date. Launch Library

Connectivity

  1. Starlink Widely available

    12.0m subscribers

    Satellite internet in 167 countries and markets, double the subscribers of a year earlier (30 Jun 2026). Over 10,200 satellites. SpaceX Q2 2026 report

  2. Starlink Mobile Early rollout

    Phone signal from space

    Phone signal straight from Starlink satellites to ordinary phones, sold through mobile networks. SpaceX Q2 2026 report

AI

  1. AI data centres (Colossus) Early rollout

    Rented to Anthropic and Google since mid-2026

    Giant AI computer centres in Memphis, rented to other AI companies and used to train Grok. Renting them out added $1.6bn of sales in Q2 2026. They can draw 1.4 GW, with over 2 GW planned by December. SpaceX Q2 2026 results, 4 Aug 2026

  2. Grok Widely available

    Grok 4.5 out since July 2026

    xAI’s AI assistant, sold by subscription with X. Grok and X subscriptions brought in $258m more than a year earlier in Q2 2026. SpaceX Q2 2026 report

  3. Starmind AI satellites In development

    In development

    AI computers on satellites, powered by the sun. Musk says each will have over 250 kW of solar power. SpaceX’s long-term goal is to send 100 GW of computers a year into orbit on Starship. Musk on X, 1 Oct 2026, SpaceX share sale document, 12 Jun 2026

  4. X Widely available

    Came with xAI

    The social network. Its advertising brought in $367m in Q2 2026, down from $426m a year earlier. SpaceX Q2 2026 report

  5. Cursor Widely available

    Bought in Aug 2026

    AI coding tool. Bought for SpaceX shares, in a deal that valued Cursor at $60bn. SpaceX filing, 14 Aug 2026

AI data centres

SpaceX builds giant AI computer centres, called Colossus, in Memphis. It rents the computers to other AI companies and uses the rest to train its own Grok AI. It is SpaceX’s fastest-growing business, and where most of its money is now being spent.

Computer power built, 30 Jun 2026
1.4 GW
3.5 times a year earlier
Target by December 2026
Over 2 GW
SpaceX, 4 Aug 2026
Target by end of 2027
5 to 10 GW
Musk: “closer to 10”
Rental deals signed
$3.3bn a month
From October, 3 customers

Computer power, built and planned

SpaceX AI computer power in gigawatts, built and planned
  1. 0.3
  2. 0.4
  3. 0.8
  4. 1.4
  5. 2+
  6. 5–10

Built SpaceX’s targets

Gigawatts (GW) of power the installed AI chips can draw. 1 GW is about the output of a large power station. SpaceX Q2 2026 results, 4 Aug 2026, SpaceX share sale document, 12 Jun 2026, SpaceX results call, 4 Aug 2026 (transcript)

Who earns the most, April to June 2026

BusinessSalesProfitSpent
Starlink $4.29bn $1.66bn $1.37bn
AI: data centres, Grok and X $2.56bn Loss $1.26bn $15.8bn
Rockets $962m Loss $542m $1.17bn

Starlink still sold and earned the most in April to June. The AI side made a loss once the cost of its chips and buildings wearing out is counted, and it took most of the spending. Spent is money put into new equipment and buildings. Profit is before interest and tax. SpaceX Q2 2026 results, 4 Aug 2026

SpaceX’s July to September results, due by mid-November, are the first test of Musk’s claim that AI sales overtake everything else from September.

Who rents the computers

CustomerWhat they rentPaysRunsCan it be ended early?
AnthropicSpaceX share sale document, 12 Jun 2026About 325,000 Nvidia chips at Colossus and Colossus II$1.25bn a monthMay 2026 to May 2029Either side, on 90 days’ notice
GoogleSpaceX filing, 5 Jun 2026About 110,000 Nvidia chips$920m a monthOct 2026 to Jun 2029 (lower fee while it starts up)Either side, on 90 days’ notice after 31 Dec 2026
Not namedSpaceX results call, 4 Aug 2026 (transcript)Computer time$6.7bn over six months (about $1.1bn a month)From Oct 2026Not given

Together about $3.3bn a month once all three are running, or about $39bn a year.

The sites

What could it earn? Do the sum

Gigawatts switched on × money each gigawatt brings in a year. Musk puts it at $30bn to $50bn a year for each gigawatt. The deals back that up: Google pays about $11bn a year for chips that need roughly 0.22 GW (about $50bn per GW); Anthropic pays $15bn a year for older chips that need roughly 0.5 GW (about $30bn per GW, our estimate from the chip count).

Musk: $30bn to $50bn
Some sits idle or is being set up

AI and data centres

$80bn a year

Plus Starlink and rockets$21bn

Whole company, yearly rate$101bn

That is, each month$8.4bn

Starlink and rockets, at the April to June 2026 rate. A yearly rate is one month’s sales × 12, not what is earned over a calendar year.

The sum at SpaceX’s own milestones

WhenPower× $30–50bn per GWWhat SpaceX and Musk say
June 2026 (built)1.4 GW$42–70bn a yearAI sales actually ran at about $10bn a year in April to June: renting only started in May. SpaceX Q2 2026 results, 4 Aug 2026
December 2026 (target)2 GW$60–100bn a yearSpaceX expects the whole company to be selling at a $100bn yearly rate in December. Musk: “not a question mark”. SpaceX results call, 4 Aug 2026 (transcript)
End of 2027 (target)10 GW$300–500bn a yearMusk: 10 GW online “will be $300 to $500 billion a year in revenue”. That is the rate at the end of 2027, so it would show in 2028. Musk to SpaceX staff, 11 Aug 2026 (Space.com)

These are targets and rough sums, not forecasts or advice. Sales are not profit: SpaceX spent $15.8bn on AI equipment in April to June alone, and is reported to be borrowing $40bn more for Nvidia chips. The rental customers can leave on 90 days’ notice.

What Musk has said on X

  • Elon Musk @elonmusk, October 1, 2026

    Each @SpaceX Star Mind super intelligence spacecraft will have over 250kW of solar power, which is about 20% more than the International Space Station

    Watch or view on X
  • Elon Musk @elonmusk, September 25, 2026

    Colossus 1 is 150k H100, 50k H200 and 30k GB200.

    Colossus 2 is 110k GB200 and 440k GB300.

    Another 220k GB300 will be fully operational next week and another 220k in November. If we get lucky, yet another 220k GB300 by late December.

    View on X
  • Elon Musk @elonmusk, January 17, 2026

    The Colossus 2 supercomputer for @Grok is now operational.

    First Gigawatt training cluster in the world. Upgrades to 1.5GW in April.

    Watch or view on X

Data centre news

  1. OpenAI again shakes up data center leadership, with xAI exec Uday Ruddarraju to lead and Sachin Katti to leave Data Center Dynamics,
  2. Oracle, Broadcom, and SpaceX looking to secure ten of billions in financing to support AI compute purchases – report Data Center Dynamics,
  3. Live coverage: AI datacenter prototypes, energy redirection demonstrators and more launching on SpaceX’s Transporter-18 Spaceflight Now,
  4. SpaceX won’t remove all of xAI’s unpermitted turbines for another year TechCrunch,
  5. Google’s biggest clean power project is 40 miles north of xAI’s unpermitted gas power plant TechCrunch,
  6. DOJ claims xAI’s unpermitted gas turbines are a matter of ‘national, economic, and energy security’ TechCrunch,

Headlines that name SpaceX or xAI and their data centres, checked through the day. They link to the full stories on the publishers’ own sites.

Launches

Coming up

  1. Fri 30 Oct, 04:02 Starlink Group 15-18 on Falcon 9 Low Earth Orbit, Vandenberg SFB, CA Go for launch
    About this mission

    A batch of 27 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

  2. Mon 2 Nov, 01:56 USSF-432 on Falcon 9 Low Earth Orbit, Vandenberg SFB, CA Go for launch
    About this mission

    A classified mission for the United States Space Force. It is possibly a batch of classified LEO satellites based on SpaceX’s Starshield satellite bus, based on locations of rocket stage drop zones being exact fits with previous Starlink Group 15 launches.

  3. Thu 5 Nov, 02:35 Starlink Group 15-21 on Falcon 9 Low Earth Orbit, Vandenberg SFB, CA Go for launch
    About this mission

    A batch of 27 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

  4. Nov 2026 (date to be set) Cygnus CRS-2 NG-25 on Falcon 9 Low Earth Orbit, Cape Canaveral SFS, FL Date not confirmed
    About this mission

    This is the 25th flight of the Orbital ATK's uncrewed resupply spacecraft Cygnus and its 24th flight to the International Space Station under the Commercial Resupply Services contract with NASA.

  5. Nov 2026 (date to be set) NROL-195 on Falcon 9 Low Earth Orbit, Vandenberg SFB, CA Date not confirmed
    About this mission

    Fifteenth batch of satellites for a reconnaissance satellite constellation built by SpaceX and Northrop Grumman for the National Reconnaissance Office to provide imaging and other reconnaissance capabilities.

  6. Dec 2026 (date to be set) SDA Tranche 2 Transport Layer D on Falcon 9 Polar Orbit, Cape Canaveral SFS, FL Date not confirmed
    About this mission

    Classified mission launched by the Space Development Agency (SDA) for Tranche 2 Transport Layer.

Times are UK time and can change at short notice.

Latest launches

  1. Tue 27 Oct, 07:25 Starlink Group 15-16 on Falcon 9 Success Vandenberg SFB, CA
  2. Fri 23 Oct, 23:48 Starlink Group 15-15 on Falcon 9 Success Vandenberg SFB, CA
  3. Tue 20 Oct, 12:04 Bandwagon 5 (Dedicated Mid-Inclination Rideshare) on Falcon 9 Success Cape Canaveral SFS, FL
  4. Fri 16 Oct, 01:01 USSF-481 on Falcon 9 Success Vandenberg SFB, CA
  5. Tue 13 Oct, 11:33 Dragon CRS-2 SpX-35 on Falcon 9 Success Cape Canaveral SFS, FL
  6. Tue 13 Oct, 01:28 Starlink Group 15-25 on Falcon 9 Success Vandenberg SFB, CA
  7. Sat 10 Oct, 08:39 SDA Tranche 1 Transport Layer A on Falcon 9 Success Vandenberg SFB, CA
  8. Fri 2 Oct, 04:54 NROL-97 on Falcon Heavy Success Kennedy Space Center, FL

Starship flights

FlightDateResult
Flight 15 No date yet Coming
SpaceX HLS LEO Demo No date yet Coming
Flight 14: Starlink Group 31-1 28 Sep 2026 Success
Flight 13 24 Jul 2026 Success
Flight 12 22 May 2026 Success
Flight 11 14 Oct 2025 Success
Flight 10 27 Aug 2025 Success
Flight 9 28 May 2025 Launch failure

Most-flown boosters

Falcon 9 first stages land and fly again. These have flown the most.

BoosterFlightsLandingsFirst flightLatest flightStatus
B1067 37 37 Jun 2021 25 Aug 2026 Active
B1063 36 36 Nov 2020 23 Oct 2026 Active
B1071 35 35 Feb 2022 11 Jul 2026 Active
B1069 32 31 Dec 2021 21 Jul 2026 Expended
B1077 30 30 Oct 2022 5 Aug 2026 Active
B1078 30 30 Mar 2023 21 Aug 2026 Active
B1080 29 29 May 2023 13 Sep 2026 Active
B1081 28 28 Aug 2023 16 Oct 2026 Active

Launch data: Launch Library 2 by The Space Devs. For the full schedule see Next Spaceflight.

Sites and growth

Every SpaceX factory, launch site, test site and AI data centre, and what is being built next. SpaceX is building in Texas, Florida, Louisiana, Tennessee and Mississippi at once. Checked on 9 Oct 2026 against company filings, government records and news.

Being built or planned
12 sites
7 being built, 5 planned. 16 already running.
Spent on buildings and equipment
$48.1bn
Jan–Sep 2026, against $13.8bn a year earlier
AI computing power
1.4 GW
At 30 Jun 2026, up from 0.4 GW a year earlier. SpaceX Q2 2026 results
Biggest single plan
$100bn
Starbase Louisiana spaceport, announced Aug 2026. The Current, 25 Aug 2026
Starship launches allowed a year
Up to 145
Starbase 25, Florida pad 39A 44, pad 37 76 (37 still needs one more FAA check). FAA: Starship at Cape Canaveral
United States
Memphis and Southaven: Minihard data centre (being built); Southaven gas power plant (being built); Southaven fifth data centre (old police and fire training site) (planned); Colossus 2 (Macrohard and Macroharder) (running and growing); Colossus 1 data centre (running); MACROHARDRR data centre (Colossus 2, Mississippi) (running)6Memphis and SouthavenCape Canaveral: Space Launch Complex 37 (Starship) (being built); Gigabay (Florida) (being built); Launch Complex 39A (incl. Starship pad) (running and growing); Roberts Road site (HangarX) (running and growing); Space Launch Complex 40 (running)5Cape CanaveralVandenberg: Vandenberg SLC-6 (being built); Vandenberg SLC-4E (running)2VandenbergBay Area: SpaceXAI head office (running and growing); Former X (Twitter) head office (closed)2Bay AreaPecan Island: Starbase Louisiana (Pecan Island spaceport) (planned)Pecan IslandHawthorne: Hawthorne factory (running)HawthorneRedmond: Redmond Starlink satellite factory (running)RedmondStarbase: Gigabay (Texas) (being built); Starbase launch site (Pads 1 and 2) (running and growing); Massey's test site (running and growing); City of Starbase and SpaceX headquarters (running and growing); Starfactory (running)5Bastrop and Austin: Gigasat factory (solar cells and AI satellites) (being built); SpaceXAI Austin office (Seaholm) (planned); Bastrop Starlink factory (running and growing)3Grimes County: Terafab chip plant (with Tesla) (planned)McGregor: McGregor engine test site (running)Texas close-up
Texas close-up
Starbase: Gigabay (Texas) (being built); Starbase launch site (Pads 1 and 2) (running and growing); Massey's test site (running and growing); City of Starbase and SpaceX headquarters (running and growing); Starfactory (running)5StarbaseBastrop and Austin: Gigasat factory (solar cells and AI satellites) (being built); SpaceXAI Austin office (Seaholm) (planned); Bastrop Starlink factory (running and growing)3Bastrop and AustinGrimes County: Terafab chip plant (with Tesla) (planned)Grimes CountyMcGregor: McGregor engine test site (running)McGregor
  • Being built
  • Planned
  • Running and growing
  • Running
  • Each dot is a place. The number is how many sites are there, and the colour shows the busiest one. Tap a dot to jump to its sites.

Memphis and Southaven 6 sites: 2 being built, 1 planned, 1 running and growing, 2 running

Cape Canaveral 5 sites: 2 being built, 2 running and growing, 1 running

Bastrop and Austin 3 sites: 1 being built, 1 planned, 1 running and growing

Starbase 5 sites: 1 being built, 3 running and growing, 1 running

Vandenberg 2 sites: 1 being built, 1 running

Grimes County 1 site: 1 planned

Pecan Island 1 site: 1 planned

Bay Area 2 sites: 1 running and growing, 1 closed

McGregor 1 site: 1 running

  • McGregor engine test site Running

    Test site, McGregor, Texas

    Tests every Merlin and Raptor engine before and after flight, plus Starship parts such as tanks and pressure vessels.

    Since
    2003
    Size
    about 4,000 acres (2015)
    Capacity
    15 test stands (prospectus)

    Latest: Prospectus (Jun 2026) calls it the world's busiest rocket test site, with 15 stands including dedicated Raptor stands.

    SpaceX IPO prospectus (424B4), Jun 2026, Wikipedia: SpaceX facilities / McGregor (site size)

Hawthorne 1 site: 1 running

  • Hawthorne factory Running

    Factory, Hawthorne, California

    Original main factory: builds Falcon rockets, Dragon capsules, Merlin and Raptor engines and Starlink dishes; still has offices.

    Since
    2008

    Latest: Prospectus (Jun 2026) still lists Hawthorne as the main Falcon, Dragon and engine factory; head office moved to Starbase, but a corporate office remains.

    SpaceX IPO prospectus (424B4), Jun 2026

Redmond 1 site: 1 running

No exact site yet 1 site: 1 planned

  • AI data centre in Saudi Arabia (with Humain) Planned

    AI data centre, Saudi Arabia, site not named

    A 500 MW AI data centre that xAI agreed to build with Saudi Arabia's Humain to run Grok.

    Capacity
    500 MW

    Latest: Announced 19 Nov 2025. No city named and no building work found by Oct 2026.

    Humain and xAI announcement, 19 Nov 2025

Land and buildings bought or rented

WhenWhereSizePriceWhat for
Mar 2024Boca Chica State Park, Cameron County, Texas ReportedGets 43, gives up 477Not givenLand swap with Texas Parks and Wildlife so Starbase launch area can expand; commission gave tentative approval, completion not confirmed Fortune: Texas Parks and Wildlife approves SpaceX land swap, 6 Mar 2024
Dec 2024North end of South Padre Island, Texas Bought54$38,750 (tax resale)Purpose not disclosed; part of nearly 500 SpaceX parcels in Cameron County RGV Business Journal: SpaceX controls 54 acres on South Padre Island, 14 Jul 2026
Mar 20255400 Tulane Road, Memphis, Tennessee BoughtAbout 100 (incl. 1m sq ft warehouse)$80m (property records)Colossus 2 AI data centre DCD: xAI buys 1m sq ft Memphis site, 10 Mar 2025
Jul 2025Former Duke Energy plant, Stanton Road, Southaven, Mississippi Bought114$10 nominal on county registerGas power plant for Colossus 2 DCD: xAI buys former gas plant site in Southaven, 21 Jul 2025
Dec 20252400 Stateline Road, Southaven, Mississippi BoughtParcels of 47 and 58 acres (about 810,000 sq ft building)Not givenMACROHARDRR data centre (third Colossus building) DeSoto Times: xAI buys building and land in Southaven, 31 Dec 2025
Mar 20261510 and 1530 Page Mill Road, Palo Alto, California RentedAbout 105,500 sq ft of officesNot givenMore space for the AI business head office Hoodline: Musk gobbles up Palo Alto offices, 20 Mar 2026
Apr 2026800 West Cesar Chavez Street, Austin, Texas Rented112,000 sq ft of officesNot givenNew xAI office in Austin Traded: 800 West Cesar Chavez Street lease, 16 Apr 2026
May 2026Gibbons Creek area, Grimes County, Texas BoughtAbout 3,219 (7 parcels)not disclosed ($10 nominal on deeds)Terafab chip plant site; bought by WIT TECH LLC, a Musk-linked company KBTX: Musk-linked firm buys land and water rights in Grimes County, 25 Jun 2026
Jun 2026FM 1209, Bastrop County, Texas Reported1,000+ (owned or under contract)Not givenGigasat factory for solar cells and AI satellites The Real Deal: SpaceX eyes 11m sq ft Gigasat in Bastrop County, 12 Jun 2026
Aug 2026Tulane Road (old police and fire training site), Southaven, Mississippi Bought51 (city gets 69 acres on Swinnea Road)$40m for the city's new training centreFifth Mid-South AI data centre DeSoto County News: training centre land swap, 18 Aug 2026
Aug 2026Pecan Island, Vermilion Parish, Louisiana ReportedAbout 125,000Not givenStarbase Louisiana spaceport on former ExxonMobil land; title terms not published Fortune: SpaceX commits $100bn to Louisiana spaceport, 27 Aug 2026
Aug 2026Near the Port of Brownsville, Texas ReportedAbout 445 (removed from Brownsville city limits)up to $220m paid towards city water projectsIndustrial land by the ship channel; city expects Starship transport by barge (not confirmed by SpaceX) KRGV/Texas Tribune: SpaceX to fund up to $220m in Brownsville water projects, 31 Aug 2026
Sep 2026Lower Rio Grande Valley wildlife refuge, near Starbase, Texas BoughtGets 715, gives up 683Not givenFederal land swap to enlarge Massey's test site and add a road to State Highway 4 Texas Tribune: judge OKs SpaceX wildlife refuge land swap, 21 Sep 2026
Oct 2026Near Massey Way, Starbase, Texas Reported166 (already SpaceX-owned)Not given45-year development agreement with the city; what will be built is not disclosed RGV Business Journal: 45-year deal on 166 acres, 8 Oct 2026
Oct 2026Freshwater City, south of Pecan Island, Louisiana Applied forHundreds of acres of wetland affected (SpaceX estimate)Not givenCargo wharf, barge berths and a 15.75-mile heavy-haul road for Starbase Louisiana Acadiana News First: SpaceX proposes cargo facility, 5 Oct 2026

Sizes are in acres unless it says otherwise. “Reported” means it comes from news reports or local records, not from SpaceX itself.

Money spent on buildings and equipment

Money spent on buildings and equipment
  1. $11.2bn
  2. $20.7bn
  3. $48.1bn

Whole years from SpaceX’s share sale document; this year so far from its latest SEC report ($13.8bn in the same months last year). Buildings and equipment on its books (after wear and tear): $89.5bn at 30 Sep 2026, up from $42.6bn at 31 Dec 2025. SpaceX share sale document, Jun 2026

New building filings in Texas

  • Restrooms and Break Areas Bastrop, 36,000 sq ft, cost given as $7.0m, due May 2027 Filed 6 Oct 2026
  • Storage Bastrop, 36,000 sq ft, cost given as $7.0m, due May 2027 Filed 30 Sep 2026
  • Office Phase 2 Bastrop, 56,000 sq ft, cost given as $7.0m, due Sep 2027 Filed 12 Aug 2026
  • BAP1 Bastrop, 157,321 sq ft, cost given as $20.0m, due Jan 2027 Filed 16 Dec 2025
  • BA01N Office Expansion Bastrop, 80,000 sq ft, cost given as $8.0m, due Jan 2026 Filed 27 Aug 2025
  • Gigabay Starbase, 700,000 sq ft, cost given as $250m, due Dec 2026 Filed 27 Jun 2025
  • ECHO River Amenity Civil Bastrop, 100,000 sq ft, cost given as $2.0m, due Aug 2025 Filed 14 May 2025
  • BA01N Interior + Breakroom Bastrop, 500,000 sq ft, cost given as $7.0m, due Feb 2026 Filed 29 Apr 2025

Every new commercial building job in Texas has to be registered with the state, with its size, dates and a cost estimate. We check the register every morning for jobs owned by SpaceX. Some very big jobs are filed with a token cost.

Building news

  1. Possible Roberts Road Expansion as SpaceX pushes for Flight 16 NASASpaceflight,
  2. Ship 40 Back At Starbase After Surprise Reentry Survival SpacePolicyOnline.com,

Headlines about factories, sites and building work, picked from the news feeds on this page.

What’s new

  1. News Flexell Space and Satoro Agree to Collaborate on In-Orbit Demonstration of Next-Generation Space Solar Cells SpaceNews,
  2. Launch Falcon 9 launched Starlink Group 15-16 Launch Library,
  3. News Launch Preview: Falcon 9 and GSLV rockets scheduled to launch NASASpaceflight,
  4. News Astranis Upgrades Falcon 9 Launch Contract to Dedicated Mission for Entire Block 4 Production Run of Satellites SpaceNews,
  5. News A New Era for Space Launch? The Coming Falcon 9 Retirement Space Scout,
  6. Filing Company announcement: other company news SEC,
  7. News Possible Roberts Road Expansion as SpaceX pushes for Flight 16 NASASpaceflight,
  8. Launch Falcon 9 launched Starlink Group 15-15 Launch Library,
  9. News NASA is Full Steam Ahead on Artemis III, IV and V SpacePolicyOnline.com,
  10. News NASA, Partners Accelerate Lander Development for 2028 Moon Missions NASA,
  11. News Rocket Report: SpaceX says no thanks to military launches; Spanish rocket nearly ready Arstechnica,
  12. Filing Shares set aside for staff SEC,
  13. Filing Quarterly report SEC,
  14. News SpaceX will attempt to reach weekly Starship launches by early 2027 Arstechnica,
  15. News Making SpaceX and Tesla a single company has "a lot of merit," Musk says Arstechnica,
  16. News Live coverage: SpaceX to launch 27 Starlink satellites on Falcon 9 rocket from Vandenberg SFB Spaceflight Now,
  17. Filing Company announcement: results or delivery report SEC,
  18. Launch Falcon 9 launched Bandwagon 5 (Dedicated Mid-Inclination Rideshare) Launch Library,
  19. News UARX Space troubleshoots anomalies on maiden OTV Flight SpaceNews,
  20. News Falcon 9 set to launch Bandwagon-5 rideshare mission from Florida NASASpaceflight,
  21. News Live coverage: SpaceX to launch Starfall reentry capsule, 31 customer payloads on Bandwagon-5 rideshare mission Spaceflight Now,
  22. Launch Falcon 9 launched USSF-481 Launch Library,
  23. Data centres OpenAI again shakes up data center leadership, with xAI exec Uday Ruddarraju to lead and Sachin Katti to leave Data Center Dynamics,
  24. Launch Falcon 9 launched Dragon CRS-2 SpX-35 Launch Library,
  25. Launch Falcon 9 launched Starlink Group 15-25 Launch Library,
  26. Launch Falcon 9 launched SDA Tranche 1 Transport Layer A Launch Library,
  27. X post Each @SpaceX Star Mind super intelligence spacecraft will have over 250kW of solar power, which is about 20% more than the International… @elonmusk,
  28. X post Colossus 1 is 150k H100, 50k H200 and 30k GB200. Colossus 2 is 110k GB200 and 440k GB300. Another 220k GB300 will be fully operational next… @elonmusk,
  29. X post The Colossus 2 supercomputer for @Grok is now operational. First Gigawatt training cluster in the world. Upgrades to 1.5GW in April. @elonmusk,
  30. Data centres Oracle, Broadcom, and SpaceX looking to secure ten of billions in financing to support AI compute purchases – report Data Center Dynamics,
  31. Building Texas building filing: Restrooms and Break Areas, 36,000 sq ft, Bastrop Texas building register,
  32. Launch Falcon Heavy launched NROL-97 Launch Library,
  33. Launch Falcon 9 launched Transporter 18 (Dedicated SSO Rideshare) Launch Library,
  34. Data centres Live coverage: AI datacenter prototypes, energy redirection demonstrators and more launching on SpaceX’s Transporter-18 Spaceflight Now,
  35. Launch Falcon 9 launched Crew-13 Launch Library,
  36. Filing Antonio J. Gracias: other 42,790,223 shares SEC,

The last 30 days. Headlines link to the full stories on the publishers’ own sites.

Numbers

Sales by business, Q2 2026 against Q2 2025

BusinessQ2 2026Q2 2025Change
Connectivity (Starlink)$4.29bn$2.59bnup +66%
AI (xAI, Grok, X)$2.56bn$737mup +247%
Space (launches and NASA work)$962m$746mup +29%
All sales$7.81bn$4.07bnup +92%

SpaceX Q2 2026 report

Profit and cash

Net result, Q3 2026
Profit of $4.40bn
Operating result, Q3 2026
Profit of $2.79bn
Cash at end of Q3 2026
$51.3bn

From SpaceX’s filings with the SEC. The cash includes the $85.7bn raised when its shares were listed in June. Next results are due by mid-November.

Launches in the quarter (SpaceX’s own count)

Q2 2026Q2 2025
Falcon launches3745
of which for customers109
Starship launches11

Directors’ share deals

Directors and senior staff must tell the SEC within two business days when they buy, sell or are given shares.

ReportedWhoWhat happened
30 Sep 2026 Antonio J. GraciasDirector Other 42,790,223 shares
24 Sep 2026 Gwynne ShotwellPresident and COO, Director Used options 555,480 shares
Sold 342,170 shares at $153.57 ($52.5m)
15 Sep 2026 Antonio J. GraciasDirector Other 42,790,223 shares
17 Jun 2026 Elon MuskCEO, CTO & Chairman, Director, Owns over 10% Awarded shares 511,368,120 shares
Returned to company 25,172,695 shares
Sold 11,390 shares at $105.32 ($1.2m)
Gift 480 shares
Other 186,545 shares
Converted 315,926,250 shares

From Form 4 filings on SEC EDGAR. ‘Used options’ means turning share options into shares; it is not a purchase on the market.

Chart by TradingView. Prices may be delayed. This page is not investment advice.

Latest videos

From SpaceX’s own YouTube channel. Videos open on YouTube.

Timeline

  1. Sep 2026Starship Flight 14 carries Starlink satellites.
  2. Aug 2026Buys Cursor, the AI coding tool, for shares.
  3. Jun 2026Shares listed on Nasdaq (SPCX) at $135 each, raising $85.7bn after costs.
  4. Jun 2026Google signs up to rent computers for $920m a month.
  5. May 2026First big computer rental deal: Anthropic, $1.25bn a month.
  6. Feb 2026Takes over xAI, the maker of Grok, which already owned X.
  7. Jan 2026xAI, soon to be part of SpaceX, switches on its Colossus II AI data centre in Memphis.
  8. Oct 2024A Super Heavy booster is caught by the launch tower for the first time.
  9. Apr 2023First full Starship test flight.
  10. Apr 2021Chosen by NASA to land astronauts on the Moon with Starship.
  11. May 2020Crew Dragon flies its first astronauts, two from NASA, to the space station.
  12. May 2019First batch of 60 Starlink satellites launched.
  13. Feb 2018First Falcon Heavy launch.
  14. Mar 2017First reuse of an orbital rocket booster.
  15. Dec 2015A Falcon 9 booster lands back on Earth for the first time.
  16. May 2012Dragon becomes the first commercial spacecraft to visit the International Space Station.
  17. Jun 2010First Falcon 9 launch.
  18. Sep 2008Falcon 1 reaches orbit, the first privately built liquid-fuel rocket to do so.
  19. Mar 2002SpaceX is founded by Elon Musk.

On X

  • Elon Musk @elonmusk, October 1, 2026

    Each @SpaceX Star Mind super intelligence spacecraft will have over 250kW of solar power, which is about 20% more than the International Space Station

    Watch or view on X
  • Elon Musk @elonmusk, September 25, 2026

    Colossus 1 is 150k H100, 50k H200 and 30k GB200.

    Colossus 2 is 110k GB200 and 440k GB300.

    Another 220k GB300 will be fully operational next week and another 220k in November. If we get lucky, yet another 220k GB300 by late December.

    View on X
  • Elon Musk @elonmusk, January 17, 2026

    The Colossus 2 supercomputer for @Grok is now operational.

    First Gigawatt training cluster in the world. Upgrades to 1.5GW in April.

    Watch or view on X

What do you think?

Share your view on SpaceX with other ChartsView members.

Start a SpaceX thread on the forum

Where this comes from

  • US filings, insider deals and financial results: SEC EDGAR
  • Launches, Starship flights and boosters: Launch Library 2 by The Space Devs
  • Starlink satellites in orbit: CelesTrak
  • Space news headlines: Spaceflight News API (links to the full stories)
  • Data centre headlines: Data Center Dynamics, TechCrunch, Data Center Knowledge, Teslarati and Spaceflight News API (links to the full stories)
  • Videos: SpaceX on YouTube
  • Data centre targets and deals: SpaceX’s filings, its results call and Elon Musk’s own posts on X
  • Products, cities and timeline: checked by ChartsView against the company’s own reports, last on 8 Oct 2026.

All sources are free and public. Data is collected each morning and refreshed through the day. This page is for information only and is not investment advice.

ChartsView is independent and is not connected with, or endorsed by, Space Exploration Technologies Corp. The company’s name is used only to say who this page is about.

Use the arrow keys to move and Enter to openSearch every page

Share tips