Nvidia tracker

Every Nvidia product and where it has got to, its AI chip roadmap, the big deals and its sales by quarter, plus the latest filings and news. Updated through the day from Nvidia's US filings, its newsroom and free public data.

NVDA NVIDIA Corporation, listed on Nasdaq Updated 4 hours ago

Sales, May–Jul 2026$96.2bnUp 106% on a year earlier. Q2 FY27 in Nvidia’s own calendar
Data centres’ share of sales92.5%$89.0bn from AI chips, systems and networking
Forecast, Aug–Oct 2026$108.0bnNvidia’s own outlook for sales, give or take 2%. Assumes no data-centre chip sales to China.
GTC Berlin keynote21 OctNvidia's next big product event. Results for Aug–Oct are expected mid-November; Nvidia hasn't set the date yet.

Products and progress

Where each Nvidia product has got to, from first announcement to widely available. Checked against Nvidia's Q2 FY27 report to the SEC (26 Aug 2026), its newsroom and GTC 2026.

AI data-centre chips

  1. Vera Rubin Early rollout

    Shipping and ramping up since Aug 2026

    Nvidia's newest AI system (VR NVL72 racks). Production shipments began in the quarter from late July 2026; racks are running at CoreWeave, Google, Microsoft Azure, Oracle and Nebius. Nvidia Q2 FY27 report to the SEC, Nvidia Q2 FY27 results

  2. Blackwell Ultra (GB300) Widely available

    Main growth driver

    The upgraded Blackwell, first delivered in July 2025. It drove most of the growth in May to July 2026. Nvidia Q2 FY27 report to the SEC

  3. Blackwell (GB200, B200) Widely available

    Widely available

    Shipping since late 2024 and still most of the systems Nvidia ships. Nvidia Q2 FY27 report to the SEC

  4. Groq 3 LPX Early rollout

    In full production since Aug 2026

    Chips for running AI answers quickly, built on technology licensed from Groq in December 2025. Replaced the planned Rubin CPX. Nvidia newsroom

  5. Rubin Ultra In development

    Due second half of 2027

    The next step after Vera Rubin, in new “Kyber” racks. Amazon plans to use it in 2027–28. Nvidia GTC 2025

  6. Feynman Announced

    Announced for 2028

    The generation after Rubin, with a new “Rosa” CPU, shown at GTC in March 2026. Nvidia GTC 2026 news

  7. Hopper (H100, H200) Widely available

    Older generation, small volumes

    The chip behind the 2023–24 AI boom. Now sold in small numbers; shipments to China were under 1% of data-centre sales in May to July 2026. Nvidia Q2 FY27 report to the SEC

Networking and processors

  1. Vera CPU Early rollout

    In full production

    Nvidia's own processor for AI systems. Standalone Vera systems are due this autumn; SpaceX's AI arm is adopting it. Nvidia newsroom

  2. Spectrum-X networking Widely available

    Widely available

    Ethernet networking for AI data centres, used by Meta and Oracle. A version that uses light instead of copper has been in production since May 2026. Nvidia newsroom

  3. NVLink Fusion Early rollout

    Partners joining

    Lets other companies' chips plug into Nvidia's fast links. Marvell, MediaTek and Amazon's Trainium chips have signed up. Nvidia and AWS

PCs and gaming

  1. GeForce RTX 50 series Widely available

    On sale since Jan 2025

    Gaming graphics cards from the RTX 5050 to the RTX 5090. No “Super” models have been announced. Nvidia

  2. RTX Spark Windows PCs Early rollout

    Laptops ship 16 Oct 2026

    Windows PCs built on Nvidia chips, made with Microsoft. Launched on 7 Oct with the Surface Laptop Ultra; laptops from Acer, Asus, Dell, HP, Lenovo, MSI and others ship on 16 Oct, small desktops in November. Nvidia blog, 7 Oct 2026

  3. DGX Spark Widely available

    On sale since Oct 2025

    A small desktop AI computer for developers. Nvidia newsroom

  4. Nintendo Switch 2 chip Widely available

    23.7m consoles shipped by June 2026

    The Switch 2 runs on a custom Nvidia processor. Nvidia blog

Cars and robots

  1. DRIVE Thor and Hyperion Early rollout

    Adopted by BYD, Geely, Isuzu and Nissan

    The computer and design Nvidia sells to car makers for self-driving. Developer kits have been available since August 2025. Nvidia newsroom

  2. Robotaxis with Uber In development

    Los Angeles and San Francisco from early 2027

    Uber is aiming for 100,000 robotaxis on Nvidia's platform from 2027, with cars built by Stellantis and Foxconn, and 28 cities by 2028. Nvidia newsroom

  3. Mercedes CLA driver assistance Widely available

    On sale

    The Mercedes CLA uses Nvidia's DRIVE AV software. Nvidia blog

  4. Jetson Thor Widely available

    On sale since Aug 2025

    The computer Nvidia sells for robots, including humanoid robots. Nvidia newsroom

  5. GR00T humanoid robot design Testing

    From Unitree late 2026

    A reference humanoid robot design that robot makers can build on. Nvidia newsroom

Software

  1. CUDA Widely available

    Version 13.4

    The software that lets programs run on Nvidia chips. It is a big reason customers stay with Nvidia. Nvidia

  2. AI Enterprise and NIM Widely available

    Sold as a subscription

    Paid software and ready-made packages for running AI models on Nvidia chips. Nvidia

AI chips and data centres

Nvidia brings out a new generation of AI chips about every year. This is where each one stands.

  1. 2022HopperOlderH100, H200
  2. 2024BlackwellWidely availableStill most systems shipped
  3. 2025Blackwell UltraMain growth driverGB300
  4. 2026Vera RubinShipping nowFrom Aug 2026Now
  5. 2027Rubin UltraIn developmentSecond half of 2027
  6. 2028FeynmanAnnouncedWith the Rosa CPU

Nvidia Q2 FY27 report to the SEC, Nvidia GTC 2026 news

Data-centre sales each quarter

Data-centre sales each quarter
  1. $89bn

Nvidia's financial year ends in late January, so its “Q2 FY27” is roughly May to July 2026.

Latest quarter: Q2 FY27 (May–Jul 2026)

Data-centre sales
$89.0bn
Up 117% on $41.1bn a year earlier
Share of all sales
92.5%
Everything else: $7.20bn
Gross margin
75.0%
Kept from each $1 of sales after the cost of making the chips
Net profit
$59.7bn
62% of sales left as profit

Nvidia’s own forecast for Aug–Oct 2026: sales of $108.0bn, give or take 2%, with a gross margin of about 74.0%. Assumes no data-centre chip sales to China.

Since February 2026 Nvidia reports just two businesses. Edge is the old Gaming, Professional Visualisation, Automotive and OEM lines added together, so earlier quarters compare like for like. Nvidia’s figures for this quarter, Nvidia Q2 FY27 results

Big deals since September 2025

Nvidia now invests in many of its own customers as well as selling them chips. Several of these are letters of intent or “up to” amounts, so not all will happen in full.

WhenWhoWhatSizeType
Sep 2026Hugging FaceNvidia is buying Hugging Face, the website where AI developers share models and data TechCrunch$12.9bnNvidia buys
Aug 2026AWS (Amazon)2 million more Nvidia GPUs in 2027–28 Nvidia newsroom2m GPUsBuys chips
Aug 2026OpenAI and SB EnergyNvidia guarantees leases for a 4.25 GW Ohio site that will only run Nvidia chips Nvidia newsroomUp to $105bnNvidia invests
Aug 2026Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs, KKRPlans for funds to pay for AI data centres (memoranda only so far) Nvidia newsroomOver $500bnPartnership
Jul 2026Safe Superintelligence (SSI)Investment plus Vera Rubin systems Nvidia newsroomNot disclosedNvidia invests
Jul 2026SK Group (South Korea)2 GW Vera Rubin AI factory Nvidia newsroom2 GWBuys chips
May 2026IRENUp to 5 GW of AI data centres; Nvidia can buy $2.1bn of IREN shares Nvidia newsroomUp to 5 GWNvidia invests
Mar 2026Nebius$2bn investment; over 5 GW by 2030 Nvidia newsroom$2bnNvidia invests
Feb 2026Meta“Millions” of Blackwell and Rubin GPUs over several years Nvidia newsroomNot disclosedBuys chips
Feb 2026OpenAINvidia put $30bn into OpenAI's funding round; OpenAI committed to 5 GW of Vera Rubin. Follows the Sept 2025 letter of intent for 10 GW and up to $100bn TechCrunch$30bnNvidia invests
Jan 2026CoreWeave$2bn investment; over 5 GW by 2030 Nvidia newsroom$2bnNvidia invests
Jan 2026xAI (now part of SpaceX)Backed xAI's $20bn round; Nvidia held $21.0bn of SpaceX shares at 30 June 2026 Nvidia holdings filing$21.0bn stakeNvidia invests
Dec 2025GroqLicence for Groq's chip technology and hiring of its staff Nvidia annual reportAbout $17bnPartnership
Nov 2025Anthropic and MicrosoftNvidia invests up to $10bn in Anthropic; Anthropic takes 1 GW of Nvidia systems Nvidia blogUp to $10bnNvidia invests
Sep 2025Intel$5bn stake plus joint PC and data-centre chips Nvidia newsroom$5bnNvidia invests
Sep 2025UKUp to 120,000 GPUs and up to £11bn through partners, plus £2bn for start-ups Nvidia newsroomUp to £11bnBuys chips

Selling AI chips to China

China used to be one of Nvidia's biggest markets. US export rules and China's own restrictions have now all but shut it out.

  1. Apr 2025The US required a licence to export the H20 chip made for China. Nvidia wrote off $4.5bn. Nvidia Q2 FY27 report to the SEC
  2. Sep 2025China's internet regulator told its tech firms to stop buying Nvidia chips. DCD
  3. Dec 2025The US allowed H200 sales to approved Chinese buyers, with 25% going to the US government. The Register
  4. 2026China restricted H200 purchases. Nvidia took a $0.4bn H200 charge, and China was under 1% of data-centre sales in May to July. Nvidia Q2 FY27 report to the SEC
  5. Aug 2026Nvidia says it is “effectively foreclosed” from China's data-centre chip market, and its forecast assumes no such sales. Nvidia Q2 FY27 results

Sites and growth

Nvidia designs chips but does not make them. Here are its own offices, labs and data centres, plus the partner factories being built in the US to make its chips and AI systems. Checked on 9 Oct 2026 against company filings, government records and news.

Being built or planned
9 sites
5 being built, 4 planned. 8 already running.
Spent on buildings and equipment
$2.68bn
Q2 FY27, against $1.90bn a year earlier
Factory and supply orders
$279bn
Promised to suppliers at 26 Jul 2026, up from $95bn in January. Nvidia Q2 FY27 report to the SEC
US manufacturing plan
Up to $500bn
Of AI systems made in the US with partners within four years (Apr 2025). Nvidia blog, 14 Apr 2025
Staff
42,000
In 38 countries at Jan 2026, up from 36,000 a year earlier. Nvidia annual report, Feb 2026

Santa Clara 3 sites: 1 being built, 1 planned, 1 running and growing

Israel 4 sites: 1 planned, 2 running and growing, 1 running

  • Kiryat Tivon R&D campus Planned

    Research centre, Kiryat Tivon employment zone, near Haifa, Israel

    Planned giant research campus with labs, offices, a park and visitor centre for up to 10,000 staff.

    When
    Building from 2027; completion expected 2031
    Size
    90 dunams (about 22 acres) of land; about 160,000 sq m of buildings
    Capacity
    Up to 10,000 staff (Nvidia)
    Money
    Land about NIS 90m (about US$29m) after a state discount (Israel Land Authority); Nvidia calls it a multibillion-shekel investment

    Latest: Nvidia confirmed the site on 18 Dec 2025 after the state land deal. Construction due to start in 2027; no build start reported in 2026.

    Times of Israel: Nvidia picks Kiryat Tivon, 18 Dec 2025, Globes: Nvidia to pay NIS 90m for Kiryat Tivon site, 16 Dec 2025, Jerusalem Post: Huang says Israel is 'second home', 20 Dec 2025

  • Israel headquarters, Yokneam Running and growing

    Offices, Ofer Park, Yokneam Illit, northern Israel

    Main Israeli base, inherited from Mellanox, designing networking chips and systems. Nvidia has about 6,200 staff in Israel in total.

    Since
    Since 2020 (came with the Mellanox purchase)
    Size
    Leases about 38,000 sq m; about 67,000 sq m once a new 11-floor building is finished in 2028 (reported)
    Capacity
    About 6,200 Israel staff across all sites (10-Q, Aug 2026)
    Money
    New building lease worth about NIS 230m over 10 years (landlord Melisron; tenant named by market sources)

    Latest: Feb 2026: Nvidia reported as tenant of a whole new 11-floor, 29,000 sq m building in Ofer Park, due 2028. Landlord did not name the tenant.

    Globes: Nvidia leases 11-floor building, 6 Feb 2026, Nvidia 10-Q Q2 FY2027 (filed 26 Aug 2026)

  • Beersheva R&D centre Running and growing

    Research centre, Gav-Yam High-Tech Park, Beersheva, Israel

    Research and development office in southern Israel, tripled in size in 2026 with plans to hire hundreds more.

    Since
    Expanded centre opened 7 Jul 2026
    Size
    About 3,000 sq m
    Capacity
    Over 150 staff, hiring hundreds more
    Money
    Rent about NIS 2.5m a year on a 10-year lease (unnamed sources, via Globes)

    Latest: 7 Jul 2026: officially opened the expanded centre, about three times the old site. Israel now has five Nvidia R&D centres.

    Globes: Nvidia inaugurates expanded Beersheva centre, 7 Jul 2026

  • Israel AI data centre, Mevo Carmel Running

    AI data centre, Mevo Carmel industrial park, near Yokneam, Israel

    In-house supercomputer site with Blackwell systems for Nvidia's Israeli chip and software teams, not for outside customers.

    Since
    Due H1 2025 (reported); described as existing in Dec 2025
    Size
    About 10,000 sq m
    Capacity
    About 30 MW
    Money
    Over US$500m (Globes report)

    Latest: Dec 2025-Jan 2026: Nvidia reported in talks to lease a second, bigger 64 MW, 30,000 sq m data centre next door from Mega Or. No signing confirmed.

    DCD: Nvidia developing 30MW data centre in Israel, 16 Jan 2025, Calcalist: Nvidia and Mega Or data centre talks, 17 Dec 2025, Calcalist: Mega Or still in talks with Nvidia, 6 Jan 2026

Phoenix area 2 sites: 1 being built, 1 running and growing

Taiwan 2 sites: 1 planned, 1 running

Sherman 1 site: 1 being built

  • Coherent optical chip fab, Sherman Being built

    Partner factory, Sherman, Texas

    Expansion of a laser and optical-chip plant whose parts carry data between Nvidia AI chips, servers and data centres.

    When
    Groundbreaking Jun 2026 with Jensen Huang; finish date not given
    Size
    Doubles production space at an existing 700,000 sq ft site
    Capacity
    Aims to quadruple wafer output within 12 months of opening
    Money
    $650m expansion (Coherent); Nvidia invested $2bn in Coherent in Mar 2026

    Latest: Jun 2026: Huang attended the groundbreaking and signed a steel beam. About 1,000 jobs expected.

    Construction Digital: Coherent and Nvidia break ground, 23 Jun 2026, Nvidia blog: Build in America, 5 Aug 2026

Houston 1 site: 1 being built

Manassas 1 site: 1 being built

Pike County, Ohio 1 site: 1 planned

  • PORTS-Pike AI data centre campus Planned

    AI data centre, Former Portsmouth uranium plant site, Pike County, Ohio

    Giant data centre campus that will host only Nvidia AI systems, leased for 20 years to OpenAI.

    When
    First capacity due 2028 (Nvidia); nine build phases
    Capacity
    4.25 GW of IT load at first, with an option on about 3.75-3.8 GW more
    Money
    Nvidia guarantees capped at $105bn plus a $1.5bn investment in SB Energy (Nvidia, Aug 2026)

    Latest: 17 Aug 2026: Nvidia agreed to back the land, power and building leases in return for exclusive use of its compute on the site.

    Nvidia press release: PORTS-Pike, 17 Aug 2026, Nvidia 10-Q Q2 FY2027 (filed 26 Aug 2026)

Fort Worth 1 site: 1 running

Bengaluru 1 site: 1 running and growing

  • Bengaluru office, Bagmane Capital Running and growing

    Offices, Memphis South Tower, Bagmane Capital, Bengaluru

    Large engineering office for Nvidia's Indian arm, one of its main R&D bases outside the US.

    Since
    Lease began 1 Apr 2026
    Size
    About 760,000 sq ft over 12 floors
    Money
    About Rs 1,230 crore over 10 years (property documents, via media)

    Latest: Apr 2026: Nvidia's India arm reported to have signed a 10-year lease on 12 floors. Reported from filed documents; not announced by Nvidia.

    Digital Terminal: Nvidia Bengaluru office deal, 29 Apr 2026

Land and buildings bought or rented

WhenWhereSizePriceWhat for
May 2024Old HQ campus, San Tomas Expressway, Santa Clara, California (8 buildings, 6 parcels) Bought8 buildings, 2 car parks, about 2m sq ft of future building rightsAbout $374m cashNvidia bought out the landlord of the campus it had rented since 1998, gaining room to build more. SF Standard, 15 May 2024
Dec 2024300 Holger Way, North San Jose, California RentedAbout 100,000 sq ft whole buildingNot givenExtra office and research space near HQ; lease from Feb 2025. CoStar, 16 Dec 2024
Jan 2025San Tomas Expressway office park, Santa Clara (3 of 4 Sobrato buildings) BoughtAbout 375,000 sq ft (three 125,000 sq ft buildings)Not givenBuildings next to HQ that Nvidia had been renting. GovTech/SJ Mercury, 9 Sep 2025
May 2025Santa Clara Commerce Park, 2300 block of Walsh Avenue, Santa Clara Bought13 acres, 10 buildings, about 251,000 sq ft$123m cashLand across the road from HQ; now proposed for a 692,000 sq ft office building (HQ phase 4). SF Standard, 6 May 2025
Sep 20252701 San Tomas Expressway, Santa Clara Bought125,000 sq ft office building$83.2mFourth and last building of the office park opposite HQ. GovTech/SJ Mercury, 9 Sep 2025
Dec 2025Kiryat Tivon employment zone, northern Israel Bought90 dunams (about 22 acres)About NIS 90m (about US$29m) plus infrastructure costsSite for a 160,000 sq m R&D campus for up to 10,000 staff. Israeli state land is held on long leases. Globes, 16 Dec 2025
Feb 2026Beitou-Shilin Technology Park plots T17-T18 (merged), Taipei RentedNearly 4 hectaresNT$12.2bn (about US$380m) for 50-year land-use rights, extendable 20 yearsSite for the Constellation Taiwan headquarters. Taipei Times, 11 Feb 2026
Feb 2026Ofer Park, Yokneam, Israel (new 11-floor building) Reported29,000 sq m; Nvidia total in the park about 67,000 sq mAbout NIS 230m over 10 yearsMore office and lab space at the Israeli HQ; building due 2028. Tenant named by market sources, not the landlord. Globes, 6 Feb 2026
Apr 2026Memphis South Tower, Bagmane Capital, Bengaluru, India ReportedAbout 760,000 sq ft, 12 floorsAbout Rs 1,230 crore over 10 yearsBig new engineering office for Nvidia's Indian arm; lease from 1 Apr 2026. Digital Terminal, 29 Apr 2026
Jul 2026Gav-Yam High-Tech Park, Beersheva, Israel RentedAbout 3,000 sq mAbout NIS 2.5m a year, 10-year lease (unnamed sources)Tripled R&D centre in southern Israel. Globes, 7 Jul 2026
Mar 2025Fairbanks Logistics Park, north-west Houston, Texas (bought by Foxconn unit Ingrasys, not Nvidia) Reported4 buildings, about 1m sq ft, 86-100 acres$142mPartner land: reported site of Foxconn's AI server plant linked to Nvidia's Houston factory plan. Dalfen, 16 Jun 2025
Summer 2025Westport 14 (14601 Mobility Way) and 35 Eagle (15200 Heritage Parkway), Fort Worth, Texas (bought by Wistron, not Nvidia) BoughtAbout 767,000 sq ft and 325,000 sq ftNot givenPartner land: Wistron bought both to build and test Nvidia AI supercomputers. Dallas Innovates, 21 Jul 2026
Aug 2025Peoria Innovation Core, north Peoria, Arizona (Amkor, via land swap with the city) Bought104 acres (swapped for a 56-acre plot)Not givenPartner land: Amkor packaging plant with Nvidia and Apple as named customers. Amkor, 28 Aug 2025

Sizes are in acres unless it says otherwise. “Reported” means it comes from news reports or local records, not from Nvidia itself.

Money spent on buildings and equipment

Money spent on buildings and equipment
  1. $2.7bn

Each quarter, from Nvidia’s cash-flow statements filed with the SEC. It covers factories, data centres, machines and chips the company keeps for itself. Buildings and equipment on its books (after wear and tear): $14.3bn at end of Q2 FY27, up from $9.14bn at end of Q2 FY26.

Building news

  1. Nvidia RTX GPU vendor Palit denies its Galax factory has closed due to a shortage of chips Tom's Hardware,
  2. NVIDIA Unveils Minerva to Bring End-to-End Observability for AI Factories Nvidia newsroom,

Headlines about factories, sites and building work, picked from the news feeds on this page.

What’s new

  1. News Oracle AI World takeaways: making Nvidia envious, and storage... sexy? Data Center Dynamics,
  2. News Blockchain and crypto firm Blockmate Ventures enters neocloud market with purchase of Nvidia B200 cluster Data Center Dynamics,
  3. Nvidia NVIDIA RTX Spark Windows Laptops Gain New Models, Agent Tools and Games Nvidia newsroom,
  4. News Voice AI in vogue: Nvidia releases new open transcription model TechCrunch,
  5. News Nvidia RTX GPU vendor Palit denies its Galax factory has closed due to a shortage of chips Tom's Hardware,
  6. News Standalone Nvidia Vera CPUs land in Oracle Cloud's multi-gigawatt deployment Tom's Hardware,
  7. Video How AI Is Advancing Human Health YouTube,
  8. Nvidia NVIDIA and Oracle Expand NVIDIA Vera Rubin to Multi-Gigawatt Scale and Bring NVIDIA Vera CPU to Oracle Cloud Infrastructure Nvidia newsroom,
  9. Nvidia How AI Is Changing the Pace of Discovery for Millions Living With Dementia Nvidia newsroom,
  10. News TSMC reportedly weighs 20% CoWoS price increase as Nvidia Blackwell and Rubin chips put pressure on packaging capacity Tom's Hardware,
  11. Video AI in the UK: Drug Discovery, Robotics and AI Factories | NVIDIA YouTube,
  12. News Nvidia backs Indian startup helping companies run AI models with fewer GPUs TechCrunch,
  13. News Nvidia is bankrolling AI accelerator supply chain buildout to reserve production capacity Tom's Hardware,
  14. Nvidia NVIDIA and Meta to Expand Collaboration on Muse and Muse Family of Models Amid Robust Growth Nvidia newsroom,
  15. Video AI in France: From NVIDIA’s First Chip to AI Factories | NVIDIA YouTube,
  16. Video How Audi is Reimagining Production With Digital Twins and Physical AI YouTube,
  17. Video Jensen Huang’s Keynote Highlights at NVIDIA GTC Berlin 2026 YouTube,
  18. Video NVIDIA GTC Berlin 2026 | Live Keynote Pregame YouTube,
  19. News Hottest toy for Christmas? Nvidia CEO plays with adorable Microduck robots, 20,000 sell TechCrunch,
  20. Video NVIDIA Halos SAFE: Autonomous Vehicle Safety Evaluation From Road Testing to Simulation YouTube,
  21. Video Accelerating Robot Development With AI Agents and NVIDIA Isaac YouTube,
  22. News Uber rival inDrive eyes 2027 robotaxi tests in Central Asia with Pony AI and Nvidia TechCrunch,
  23. Nvidia Kazakhstan Expands Compute for Its AI Future Nvidia newsroom,
  24. Nvidia NVIDIA Unveils Minerva to Bring End-to-End Observability for AI Factories Nvidia newsroom,
  25. Nvidia Cloud Deployment Incoming: ‘Call of Duty: Modern Warfare 4’ Arrives on GeForce NOW Nvidia newsroom,
  26. Nvidia Leading European Financial Services Organizations Embrace Open Models to Build Proprietary Intelligence Nvidia newsroom,
  27. Nvidia NVIDIA Cosmos Opens New Tools to Train, Evaluate and Deploy World Models Nvidia newsroom,
  28. Nvidia How Companies Are Using NVIDIA DSX to Break the Power Bottleneck Nvidia newsroom,
  29. Nvidia NVIDIA Transforms European Retail, From Digital Discovery to Physical Operations Nvidia newsroom,
  30. Nvidia Pioneers Across Europe Deploy NVIDIA Earth-2 Open Models to Power Real-World Weather and Climate Prediction Nvidia newsroom,
  31. Nvidia NVIDIA Open Models Power a New Wave of European Public Sector Projects Nvidia newsroom,
  32. Nvidia Bringing the Spark to Europe: Local Intelligence Powers Next Wave of Agents Nvidia newsroom,
  33. Nvidia Google Cloud and NVIDIA Announce General Availability of NVIDIA Vera Rubin Infrastructure Nvidia newsroom,
  34. Nvidia NVIDIA and Supply Chain Partners Expand Capacity to Accelerate AI Infrastructure Buildout Nvidia newsroom,
  35. Nvidia NVIDIA Cloud Partners Scale Across Europe — Sovereign, Open and Built for Safe AI Agents Nvidia newsroom,
  36. Nvidia Europe’s Industrial Leaders Reinvent Engineering and Manufacturing With NVIDIA Nvidia newsroom,

The last 30 days. Headlines link to the full stories on the publishers’ own sites.

Numbers

Sales each quarter

Nvidia sales each quarter
  1. $96bn

Net profit each quarter

Nvidia net profit each quarter
  1. $60bn
QuarterMonthsSalesData centresEverything elseNet profitGross margin
Q2 FY27May–Jul 2026 $96.2bn $89.0bn $7.20bn $59.7bn 75.0%
Q1 FY27Feb–Apr 2026 $81.6bn $75.2bn $6.37bn $58.3bn 74.9%
Q4 FY26Nov 2025–Jan 2026 $68.1bn $62.3bn $5.81bn $43.0bn 75.0%
Q3 FY26Aug–Oct 2025 $57.0bn $51.2bn $5.79bn $31.9bn 73.4%
Q2 FY26May–Jul 2025 $46.7bn $41.1bn $5.65bn $26.4bn 72.4%
Q1 FY26Feb–Apr 2025 $44.1bn $39.1bn $4.95bn $18.8bn 60.5%
Q4 FY25Nov 2024–Jan 2025 $39.3bn $35.6bn $3.75bn $22.1bn 73.0%
Q3 FY25Aug–Oct 2024 $35.1bn $30.8bn $4.31bn $19.3bn 74.6%

Nvidia's financial year ends in late January, so its “Q2 FY27” is roughly May to July 2026. From Nvidia’s results filed with the SEC; newer quarters appear automatically, with the business split added after each report is checked.

Directors’ share deals

Directors and senior staff must tell the SEC within two business days when they buy, sell or are given shares.

ReportedWhoWhat happened
13 Oct 2026 Nicholas P. ParkerEVP, Worldwide Field Ops Awarded shares 160,418 shares
9 Oct 2026 Tench CoxeDirector Gift 500,000 shares
23 Sep 2026 Timothy S. TeterEVP, General Counsel and Sec Sold 30,460 shares at $222.80 ($6.8m)
22 Sep 2026 Mark A StevensDirector Sold 1,366,000 shares at $219.73 ($300m)
18 Sep 2026 Scott GawelPrincipal Accounting Officer Shares kept back for tax 2,932 shares
18 Sep 2026 Debora ShoquistEVP, Operations Shares kept back for tax 35,008 shares
18 Sep 2026 Timothy S. TeterEVP, General Counsel and Sec Shares kept back for tax 35,738 shares
18 Sep 2026 Colette KressEVP & Chief Financial Officer Shares kept back for tax 40,747 shares
Sold 34,918 shares at $219.05 ($7.6m)

From Form 4 filings on SEC EDGAR. ‘Used options’ means turning share options into shares; it is not a purchase on the market.

Chart by TradingView. Prices may be delayed. This page is not investment advice.

Latest videos

From Nvidia’s own YouTube channel. Videos open on YouTube.

Timeline

  1. Oct 2026Launches RTX Spark Windows PCs with Microsoft.
  2. Sep 2026Adds $150bn to its share buyback, leaving $235bn to spend by early 2028.
  3. Sep 2026Agrees to buy Hugging Face for $12.9bn.
  4. Aug 2026Vera Rubin production shipments begin.
  5. Mar 2026Shows the Feynman chips for 2028 at its GTC conference.
  6. Dec 2025Licenses Groq's chip technology and hires its staff.
  7. Oct 2025First company worth $5 trillion.
  8. Jul 2025First company worth $4 trillion.
  9. Jun 2024Passes $3 trillion.
  10. May 2023Worth $1 trillion for the first time.
  11. Sep 2022H100 (Hopper) in full production.
  12. Apr 2020Buys Mellanox, the networking business behind its data-centre links.
  13. 2018RTX graphics cards bring real-time ray tracing.
  14. 2012AlexNet, trained on Nvidia GPUs, kicks off modern AI.
  15. 2006CUDA lets GPUs run general programs, not just graphics.
  16. 1999GeForce 256, which Nvidia called the first GPU.
  17. Jan 1999Shares listed on Nasdaq.
  18. Apr 1993Nvidia is founded by Jensen Huang, Chris Malachowsky and Curtis Priem.

On X

Posts worth seeing will be added here. Meanwhile, these are the accounts to follow:

What do you think?

Share your view on Nvidia with other ChartsView members.

Start an Nvidia thread on the forum

Where this comes from

  • US filings, results and insider deals: SEC EDGAR
  • Company news: Nvidia newsroom
  • Headlines: TechCrunch, Tom's Hardware, The Register and Data Center Dynamics (links to the full stories)
  • Videos: Nvidia on YouTube
  • Products, cities and timeline: checked by ChartsView against the company’s own reports, last on 8 Oct 2026.

All sources are free and public. Data is collected each morning and refreshed through the day. This page is for information only and is not investment advice.

ChartsView is independent and is not connected with, or endorsed by, NVIDIA Corporation. The company’s name is used only to say who this page is about.

Use the arrow keys to move and Enter to openSearch every page

Share tips