Nvidia tracker
Every Nvidia product and where it has got to, its AI chip roadmap, the big deals and its sales by quarter, plus the latest filings and news. Updated through the day from Nvidia's US filings, its newsroom and free public data.
Products and progress
Where each Nvidia product has got to, from first announcement to widely available. Checked against Nvidia's Q2 FY27 report to the SEC (26 Aug 2026), its newsroom and GTC 2026.
AI data-centre chips
-
Vera Rubin Early rollout
Shipping and ramping up since Aug 2026
Nvidia's newest AI system (VR NVL72 racks). Production shipments began in the quarter from late July 2026; racks are running at CoreWeave, Google, Microsoft Azure, Oracle and Nebius. Nvidia Q2 FY27 report to the SEC, Nvidia Q2 FY27 results
-
Blackwell Ultra (GB300) Widely available
Main growth driver
The upgraded Blackwell, first delivered in July 2025. It drove most of the growth in May to July 2026. Nvidia Q2 FY27 report to the SEC
-
Blackwell (GB200, B200) Widely available
Widely available
Shipping since late 2024 and still most of the systems Nvidia ships. Nvidia Q2 FY27 report to the SEC
-
Groq 3 LPX Early rollout
In full production since Aug 2026
Chips for running AI answers quickly, built on technology licensed from Groq in December 2025. Replaced the planned Rubin CPX. Nvidia newsroom
-
Rubin Ultra In development
Due second half of 2027
The next step after Vera Rubin, in new “Kyber” racks. Amazon plans to use it in 2027–28. Nvidia GTC 2025
-
Feynman Announced
Announced for 2028
The generation after Rubin, with a new “Rosa” CPU, shown at GTC in March 2026. Nvidia GTC 2026 news
-
Hopper (H100, H200) Widely available
Older generation, small volumes
The chip behind the 2023–24 AI boom. Now sold in small numbers; shipments to China were under 1% of data-centre sales in May to July 2026. Nvidia Q2 FY27 report to the SEC
Networking and processors
-
Vera CPU Early rollout
In full production
Nvidia's own processor for AI systems. Standalone Vera systems are due this autumn; SpaceX's AI arm is adopting it. Nvidia newsroom
-
Spectrum-X networking Widely available
Widely available
Ethernet networking for AI data centres, used by Meta and Oracle. A version that uses light instead of copper has been in production since May 2026. Nvidia newsroom
-
NVLink Fusion Early rollout
Partners joining
Lets other companies' chips plug into Nvidia's fast links. Marvell, MediaTek and Amazon's Trainium chips have signed up. Nvidia and AWS
PCs and gaming
-
GeForce RTX 50 series Widely available
On sale since Jan 2025
Gaming graphics cards from the RTX 5050 to the RTX 5090. No “Super” models have been announced. Nvidia
-
RTX Spark Windows PCs Early rollout
Laptops ship 16 Oct 2026
Windows PCs built on Nvidia chips, made with Microsoft. Launched on 7 Oct with the Surface Laptop Ultra; laptops from Acer, Asus, Dell, HP, Lenovo, MSI and others ship on 16 Oct, small desktops in November. Nvidia blog, 7 Oct 2026
-
DGX Spark Widely available
On sale since Oct 2025
A small desktop AI computer for developers. Nvidia newsroom
-
Nintendo Switch 2 chip Widely available
23.7m consoles shipped by June 2026
The Switch 2 runs on a custom Nvidia processor. Nvidia blog
Cars and robots
-
DRIVE Thor and Hyperion Early rollout
Adopted by BYD, Geely, Isuzu and Nissan
The computer and design Nvidia sells to car makers for self-driving. Developer kits have been available since August 2025. Nvidia newsroom
-
Robotaxis with Uber In development
Los Angeles and San Francisco from early 2027
Uber is aiming for 100,000 robotaxis on Nvidia's platform from 2027, with cars built by Stellantis and Foxconn, and 28 cities by 2028. Nvidia newsroom
-
Mercedes CLA driver assistance Widely available
On sale
The Mercedes CLA uses Nvidia's DRIVE AV software. Nvidia blog
-
Jetson Thor Widely available
On sale since Aug 2025
The computer Nvidia sells for robots, including humanoid robots. Nvidia newsroom
-
GR00T humanoid robot design Testing
From Unitree late 2026
A reference humanoid robot design that robot makers can build on. Nvidia newsroom
Software
AI chips and data centres
Nvidia brings out a new generation of AI chips about every year. This is where each one stands.
- 2022HopperOlderH100, H200
- 2024BlackwellWidely availableStill most systems shipped
- 2025Blackwell UltraMain growth driverGB300
- 2026Vera RubinShipping nowFrom Aug 2026Now
- 2027Rubin UltraIn developmentSecond half of 2027
- 2028FeynmanAnnouncedWith the Rosa CPU
Nvidia Q2 FY27 report to the SEC, Nvidia GTC 2026 news
Data-centre sales each quarter
Nvidia's financial year ends in late January, so its “Q2 FY27” is roughly May to July 2026.
Latest quarter: Q2 FY27 (May–Jul 2026)
- Data-centre sales
- $89.0bn
- Up 117% on $41.1bn a year earlier
- Share of all sales
- 92.5%
- Everything else: $7.20bn
- Gross margin
- 75.0%
- Kept from each $1 of sales after the cost of making the chips
- Net profit
- $59.7bn
- 62% of sales left as profit
Nvidia’s own forecast for Aug–Oct 2026: sales of $108.0bn, give or take 2%, with a gross margin of about 74.0%. Assumes no data-centre chip sales to China.
Since February 2026 Nvidia reports just two businesses. Edge is the old Gaming, Professional Visualisation, Automotive and OEM lines added together, so earlier quarters compare like for like. Nvidia’s figures for this quarter, Nvidia Q2 FY27 results
Big deals since September 2025
Nvidia now invests in many of its own customers as well as selling them chips. Several of these are letters of intent or “up to” amounts, so not all will happen in full.
| When | Who | What | Size | Type |
|---|---|---|---|---|
| Sep 2026 | Hugging Face | Nvidia is buying Hugging Face, the website where AI developers share models and data TechCrunch | $12.9bn | Nvidia buys |
| Aug 2026 | AWS (Amazon) | 2 million more Nvidia GPUs in 2027–28 Nvidia newsroom | 2m GPUs | Buys chips |
| Aug 2026 | OpenAI and SB Energy | Nvidia guarantees leases for a 4.25 GW Ohio site that will only run Nvidia chips Nvidia newsroom | Up to $105bn | Nvidia invests |
| Aug 2026 | Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs, KKR | Plans for funds to pay for AI data centres (memoranda only so far) Nvidia newsroom | Over $500bn | Partnership |
| Jul 2026 | Safe Superintelligence (SSI) | Investment plus Vera Rubin systems Nvidia newsroom | Not disclosed | Nvidia invests |
| Jul 2026 | SK Group (South Korea) | 2 GW Vera Rubin AI factory Nvidia newsroom | 2 GW | Buys chips |
| May 2026 | IREN | Up to 5 GW of AI data centres; Nvidia can buy $2.1bn of IREN shares Nvidia newsroom | Up to 5 GW | Nvidia invests |
| Mar 2026 | Nebius | $2bn investment; over 5 GW by 2030 Nvidia newsroom | $2bn | Nvidia invests |
| Feb 2026 | Meta | “Millions” of Blackwell and Rubin GPUs over several years Nvidia newsroom | Not disclosed | Buys chips |
| Feb 2026 | OpenAI | Nvidia put $30bn into OpenAI's funding round; OpenAI committed to 5 GW of Vera Rubin. Follows the Sept 2025 letter of intent for 10 GW and up to $100bn TechCrunch | $30bn | Nvidia invests |
| Jan 2026 | CoreWeave | $2bn investment; over 5 GW by 2030 Nvidia newsroom | $2bn | Nvidia invests |
| Jan 2026 | xAI (now part of SpaceX) | Backed xAI's $20bn round; Nvidia held $21.0bn of SpaceX shares at 30 June 2026 Nvidia holdings filing | $21.0bn stake | Nvidia invests |
| Dec 2025 | Groq | Licence for Groq's chip technology and hiring of its staff Nvidia annual report | About $17bn | Partnership |
| Nov 2025 | Anthropic and Microsoft | Nvidia invests up to $10bn in Anthropic; Anthropic takes 1 GW of Nvidia systems Nvidia blog | Up to $10bn | Nvidia invests |
| Sep 2025 | Intel | $5bn stake plus joint PC and data-centre chips Nvidia newsroom | $5bn | Nvidia invests |
| Sep 2025 | UK | Up to 120,000 GPUs and up to £11bn through partners, plus £2bn for start-ups Nvidia newsroom | Up to £11bn | Buys chips |
Selling AI chips to China
China used to be one of Nvidia's biggest markets. US export rules and China's own restrictions have now all but shut it out.
- Apr 2025The US required a licence to export the H20 chip made for China. Nvidia wrote off $4.5bn. Nvidia Q2 FY27 report to the SEC
- Sep 2025China's internet regulator told its tech firms to stop buying Nvidia chips. DCD
- Dec 2025The US allowed H200 sales to approved Chinese buyers, with 25% going to the US government. The Register
- 2026China restricted H200 purchases. Nvidia took a $0.4bn H200 charge, and China was under 1% of data-centre sales in May to July. Nvidia Q2 FY27 report to the SEC
- Aug 2026Nvidia says it is “effectively foreclosed” from China's data-centre chip market, and its forecast assumes no such sales. Nvidia Q2 FY27 results
Sites and growth
Nvidia designs chips but does not make them. Here are its own offices, labs and data centres, plus the partner factories being built in the US to make its chips and AI systems. Checked on 9 Oct 2026 against company filings, government records and news.
- Being built or planned
- 9 sites
- 5 being built, 4 planned. 8 already running.
- Spent on buildings and equipment
- $2.68bn
- Q2 FY27, against $1.90bn a year earlier
- Factory and supply orders
- $279bn
- Promised to suppliers at 26 Jul 2026, up from $95bn in January. Nvidia Q2 FY27 report to the SEC
- US manufacturing plan
- Up to $500bn
- Of AI systems made in the US with partners within four years (Apr 2025). Nvidia blog, 14 Apr 2025
- Staff
- 42,000
- In 38 countries at Jan 2026, up from 36,000 a year earlier. Nvidia annual report, Feb 2026
- Being built
- Planned
- Running and growing
- Running
- Each dot is a place. The number is how many sites are there, and the colour shows the busiest one. Tap a dot to jump to its sites.
Santa Clara 3 sites: 1 being built, 1 planned, 1 running and growing
New HQ building (phase 3), 2400 Condensa St Being built
Offices, 2400 Condensa Street, Santa Clara, California
Third big HQ building: three storeys of offices and labs, a large car park and a footbridge over the creek to Endeavor and Voyager.
- When
- Design approved Oct 2025; opening date not announced
- Size
- About 324,000-345,000 sq ft, plus a car park for about 2,700-2,900 cars
Latest: City approved the design on 1 Oct 2025. A local blogger reported the three-storey frame rising on site in Sept 2026 (reported, not confirmed by Nvidia).
Peninsula Press: Santa Clara approves Nvidia phase 3, 14 Oct 2025, SF YIMBY: renderings for 2400 Condensa St, 26 Sep 2025, Silicon Valley Cyclist blog: Nvidia's new building in the works, 2 Sep 2026
Walsh Avenue building: HQ phase 4 Planned
Offices, 2300-2350 Walsh Avenue, Santa Clara, California
Proposed very large office building on a business park Nvidia bought in 2025, linked to the main campus by a bridge.
- When
- Building could start Q1 2027 if approved; 24-30 months to build
- Size
- About 692,000 sq ft, 2,000+ underground parking spaces
- Money
- Site (13 acres, 10 old buildings) bought for $123m cash (county filings via press, May 2025)
Latest: July 2026: developer told residents full construction could begin in Q1 2027 if the city approves. No approval reported yet.
Silicon Valley Voice: Nvidia community meeting, 13 Feb 2026, Citizen Portal: Nvidia campus update meeting, 10 Jul 2026, SF Standard: Nvidia buys Walsh Ave park for $123m, 6 May 2025
Santa Clara headquarters (Endeavor, Voyager and older campus) Running and growing
Offices, 2788 San Tomas Expressway, Santa Clara, California
Nvidia's head office for chip design, research and management, centred on the Endeavor and Voyager buildings plus older neighbouring blocks.
- Since
- On site since 1998; Endeavor 2017-18, Voyager 2022
- Size
- About 3m sq ft owned and leased for HQ (10-K); Endeavor and Voyager alone about 1.2m sq ft
- Money
- At least $835m spent since 2024 buying the old campus ($374m, May 2024) and neighbouring buildings (county records, via press)
Latest: Sept 2025: bought the last of four San Tomas Expressway office buildings for $83.2m. Nvidia now owns nearly all of a 58.6-acre block around its HQ.
Nvidia 10-K FY2026 (filed 25 Feb 2026), GovTech/SJ Mercury: Nvidia buys $83.2m building, 9 Sep 2025, SF Standard: Nvidia wins bidding for HQ campus, 15 May 2024, CoStar: Nvidia office lease, 16 Dec 2024
Israel 4 sites: 1 planned, 2 running and growing, 1 running
Kiryat Tivon R&D campus Planned
Research centre, Kiryat Tivon employment zone, near Haifa, Israel
Planned giant research campus with labs, offices, a park and visitor centre for up to 10,000 staff.
- When
- Building from 2027; completion expected 2031
- Size
- 90 dunams (about 22 acres) of land; about 160,000 sq m of buildings
- Capacity
- Up to 10,000 staff (Nvidia)
- Money
- Land about NIS 90m (about US$29m) after a state discount (Israel Land Authority); Nvidia calls it a multibillion-shekel investment
Latest: Nvidia confirmed the site on 18 Dec 2025 after the state land deal. Construction due to start in 2027; no build start reported in 2026.
Times of Israel: Nvidia picks Kiryat Tivon, 18 Dec 2025, Globes: Nvidia to pay NIS 90m for Kiryat Tivon site, 16 Dec 2025, Jerusalem Post: Huang says Israel is 'second home', 20 Dec 2025
Israel headquarters, Yokneam Running and growing
Offices, Ofer Park, Yokneam Illit, northern Israel
Main Israeli base, inherited from Mellanox, designing networking chips and systems. Nvidia has about 6,200 staff in Israel in total.
- Since
- Since 2020 (came with the Mellanox purchase)
- Size
- Leases about 38,000 sq m; about 67,000 sq m once a new 11-floor building is finished in 2028 (reported)
- Capacity
- About 6,200 Israel staff across all sites (10-Q, Aug 2026)
- Money
- New building lease worth about NIS 230m over 10 years (landlord Melisron; tenant named by market sources)
Latest: Feb 2026: Nvidia reported as tenant of a whole new 11-floor, 29,000 sq m building in Ofer Park, due 2028. Landlord did not name the tenant.
Globes: Nvidia leases 11-floor building, 6 Feb 2026, Nvidia 10-Q Q2 FY2027 (filed 26 Aug 2026)
Beersheva R&D centre Running and growing
Research centre, Gav-Yam High-Tech Park, Beersheva, Israel
Research and development office in southern Israel, tripled in size in 2026 with plans to hire hundreds more.
- Since
- Expanded centre opened 7 Jul 2026
- Size
- About 3,000 sq m
- Capacity
- Over 150 staff, hiring hundreds more
- Money
- Rent about NIS 2.5m a year on a 10-year lease (unnamed sources, via Globes)
Latest: 7 Jul 2026: officially opened the expanded centre, about three times the old site. Israel now has five Nvidia R&D centres.
Globes: Nvidia inaugurates expanded Beersheva centre, 7 Jul 2026
Israel AI data centre, Mevo Carmel Running
AI data centre, Mevo Carmel industrial park, near Yokneam, Israel
In-house supercomputer site with Blackwell systems for Nvidia's Israeli chip and software teams, not for outside customers.
- Since
- Due H1 2025 (reported); described as existing in Dec 2025
- Size
- About 10,000 sq m
- Capacity
- About 30 MW
- Money
- Over US$500m (Globes report)
Latest: Dec 2025-Jan 2026: Nvidia reported in talks to lease a second, bigger 64 MW, 30,000 sq m data centre next door from Mega Or. No signing confirmed.
DCD: Nvidia developing 30MW data centre in Israel, 16 Jan 2025, Calcalist: Nvidia and Mega Or data centre talks, 17 Dec 2025, Calcalist: Mega Or still in talks with Nvidia, 6 Jan 2026
Phoenix area 2 sites: 1 being built, 1 running and growing
Amkor chip packaging campus, Peoria Being built
Partner factory, Peoria Innovation Core, north Peoria, Arizona
Advanced packaging and testing plant to finish chips made at TSMC Arizona; Nvidia and Apple are named customers.
- When
- Groundbreaking Oct 2025; first production expected early 2028
- Size
- 104-acre site (City of Peoria); about 93,000 sq m of cleanroom after phase 2 (Amkor)
- Capacity
- Over 3,500 staff once phases 1 and 2 are done (Amkor)
- Money
- About $12bn planned (Amkor, Sep 2026); Nvidia deal worth $1.5bn including a prepayment (Amkor, Jul 2026)
Latest: 8 Sep 2026: Amkor added phase 2 (build late 2027 to end-2029). 23 Jul 2026: signed a $1.5bn multi-year packaging deal with Nvidia.
Amkor: breaks ground in Arizona, 6 Oct 2025, Amkor: strategic partnership with Nvidia, 23 Jul 2026, Amkor: phase 2 of Arizona campus, 8 Sep 2026, Peoria Economic Development: Amkor project page
TSMC Arizona chip fabs Running and growing
Partner factory, North Phoenix, Arizona
Makes Nvidia Blackwell chip wafers in the US. Final advanced packaging was still done in Taiwan (Oct 2025).
- Since
- Fab 1 in volume late 2024; first US Nvidia Blackwell wafer Oct 2025
- Capacity
- Fab 1 makes 4nm chips; Fab 2 (3nm) built, volume in 2027; plan for 10 fabs and 2 packaging plants
- Money
- TSMC plans $265bn in Arizona in total (TSMC / Arizona Commerce Authority, Jul 2026)
Latest: 16 Jul 2026: TSMC added $100bn to its Arizona plans. Nvidia said in Aug 2026 the Phoenix fab is making Blackwell wafers in volume.
Arizona Commerce Authority: TSMC announcement, 16 Jul 2026, Nvidia blog: Build in America, 5 Aug 2026, DCD: first US-made Blackwell wafer, 20 Oct 2025
Taiwan 2 sites: 1 planned, 1 running
Constellation: Taiwan headquarters Planned
Offices, Beitou-Shilin Technology Park (plots T17-T18), Taipei
Nvidia's first overseas headquarters campus, close to its Taiwanese chip and server partners, for about 4,000 staff.
- When
- Construction expected by end-2026; move-in planned 2030
- Size
- Nearly 4-hectare site (Nvidia); about 700,000 sq ft planned (Commercial Times)
- Capacity
- About 4,000 Nvidia staff; over 10,000 jobs in total (Taipei city)
- Money
- NT$12.2bn (about US$380m) for 50-year land-use rights (Taipei city); build cost over NT$40bn (about US$1.3bn) in Nvidia's plan
Latest: 27 May 2026: Huang and Taipei's mayor unveiled the site. As of 25 May no building permit had been filed; construction now expected by end-2026.
Taipei Times: Taipei and Nvidia sign HQ contract, 11 Feb 2026, Focus Taiwan: Huang at Beitou-Shilin, 27 May 2026, PTS News: building permit not yet filed, 25 May 2026, Nvidia Newsroom on X: Constellation unveiled, 27 May 2026, Commercial Times: Constellation details, 3 Jun 2026
Taipei-1 supercomputer Running
AI data centre, Kaohsiung Software Park, Kaohsiung, Taiwan
Nvidia-owned AI supercomputer in southern Taiwan.
- Since
- 2024 (on the June 2024 TOP500 list)
- Capacity
- 40,960 cores; ranked 38th in the world, June 2024
Latest: No newer public update found; last confirmed on the June 2024 TOP500 list. A second Taiwan centre was floated in 2024 but not confirmed.
Wikipedia: Taipei-1 (supercomputer), read 9 Oct 2026, Taipei Times: Nvidia plans second AI centre, Jun 2024
Sherman 1 site: 1 being built
Coherent optical chip fab, Sherman Being built
Partner factory, Sherman, Texas
Expansion of a laser and optical-chip plant whose parts carry data between Nvidia AI chips, servers and data centres.
- When
- Groundbreaking Jun 2026 with Jensen Huang; finish date not given
- Size
- Doubles production space at an existing 700,000 sq ft site
- Capacity
- Aims to quadruple wafer output within 12 months of opening
- Money
- $650m expansion (Coherent); Nvidia invested $2bn in Coherent in Mar 2026
Latest: Jun 2026: Huang attended the groundbreaking and signed a steel beam. About 1,000 jobs expected.
Construction Digital: Coherent and Nvidia break ground, 23 Jun 2026, Nvidia blog: Build in America, 5 Aug 2026
Houston 1 site: 1 being built
Foxconn AI server plant, Houston Being built
Partner factory, Fairbanks North Houston Road, north-west Houston, Texas
Foxconn factory being set up to build Nvidia AI server systems such as GB300 trays, with humanoid robots planned on the line.
- When
- Nvidia said Apr 2025 that mass output would ramp within 12-15 months; start not yet confirmed
- Size
- Foxconn site: 4 buildings, about 1m sq ft on 86-100 acres (reported)
- Money
- About $450m and 600 jobs (Greater Houston Partnership, reported); site bought for $142m
Latest: Aug 2026: Nvidia says Foxconn 'is building' its Houston factory for Nvidia AI systems. No public confirmation yet of volume output.
Nvidia blog: Build in America, 5 Aug 2026, Nvidia blog: US-made AI supercomputers, 14 Apr 2025, Dalfen: Foxconn buys 1m sq ft Houston campus, 16 Jun 2025, FreightWaves: Foxconn $450m Houston investment, 5 Jun 2025, Texas TDLR filing TABS2025005362: Foxconn 8718 Fairbanks
Manassas 1 site: 1 being built
AI Factory Research Center, Manassas Being built
AI data centre, Digital Realty campus, Manassas, Virginia
Test-bed AI data centre for Nvidia's Vera Rubin systems and its blueprint for gigawatt-scale 'AI factories'.
- When
- Announced Oct 2025; linked 96 MW Aurora building was due H1 2026
- Capacity
- Aurora building 96 MW (InsideNoVa)
Latest: No confirmed opening found as of Oct 2026. Nvidia's Aug 2026 US blog still lists Digital Realty's Manassas AI factory blueprint work.
Nvidia press release: AI factory research center, 28 Oct 2025, Digital Realty release, 3 Nov 2025, InsideNoVa: Nvidia AI research data centre in Manassas, 2 Nov 2025, Nvidia blog: Build in America, 5 Aug 2026
Pike County, Ohio 1 site: 1 planned
PORTS-Pike AI data centre campus Planned
AI data centre, Former Portsmouth uranium plant site, Pike County, Ohio
Giant data centre campus that will host only Nvidia AI systems, leased for 20 years to OpenAI.
- When
- First capacity due 2028 (Nvidia); nine build phases
- Capacity
- 4.25 GW of IT load at first, with an option on about 3.75-3.8 GW more
- Money
- Nvidia guarantees capped at $105bn plus a $1.5bn investment in SB Energy (Nvidia, Aug 2026)
Latest: 17 Aug 2026: Nvidia agreed to back the land, power and building leases in return for exclusive use of its compute on the site.
Nvidia press release: PORTS-Pike, 17 Aug 2026, Nvidia 10-Q Q2 FY2027 (filed 26 Aug 2026)
Fort Worth 1 site: 1 running
Wistron AI supercomputer plant (D1), Fort Worth Running
Partner factory, AllianceTexas area, north Fort Worth, Texas
Wistron's first US factory, building and testing Nvidia GB300 superchip boards; a second line for Vera Rubin is being prepared.
- Since
- Jul 2026
- Size
- 324,000 sq ft (D1); Wistron also bought a second, 767,000 sq ft building nearby
- Capacity
- Scaling to tens of thousands of boards a month during 2026 (Nvidia)
- Money
- $700m commitment (Nvidia/Wistron); $761m for two Fort Worth plants (Dallas Innovates)
Latest: Opened 21 Jul 2026 and already producing GB300. Over 500 jobs created, aiming for 1,000 by end-2026.
Nvidia blog: Built in Fort Worth, 21 Jul 2026, DCD: Wistron opens $700m Fort Worth site, 22 Jul 2026, Dallas Innovates: Wistron Fort Worth opening, 21 Jul 2026
Bengaluru 1 site: 1 running and growing
Bengaluru office, Bagmane Capital Running and growing
Offices, Memphis South Tower, Bagmane Capital, Bengaluru
Large engineering office for Nvidia's Indian arm, one of its main R&D bases outside the US.
- Since
- Lease began 1 Apr 2026
- Size
- About 760,000 sq ft over 12 floors
- Money
- About Rs 1,230 crore over 10 years (property documents, via media)
Latest: Apr 2026: Nvidia's India arm reported to have signed a 10-year lease on 12 floors. Reported from filed documents; not announced by Nvidia.
Land and buildings bought or rented
| When | Where | Size | Price | What for |
|---|---|---|---|---|
| May 2024 | Old HQ campus, San Tomas Expressway, Santa Clara, California (8 buildings, 6 parcels) Bought | 8 buildings, 2 car parks, about 2m sq ft of future building rights | About $374m cash | Nvidia bought out the landlord of the campus it had rented since 1998, gaining room to build more. SF Standard, 15 May 2024 |
| Dec 2024 | 300 Holger Way, North San Jose, California Rented | About 100,000 sq ft whole building | Not given | Extra office and research space near HQ; lease from Feb 2025. CoStar, 16 Dec 2024 |
| Jan 2025 | San Tomas Expressway office park, Santa Clara (3 of 4 Sobrato buildings) Bought | About 375,000 sq ft (three 125,000 sq ft buildings) | Not given | Buildings next to HQ that Nvidia had been renting. GovTech/SJ Mercury, 9 Sep 2025 |
| May 2025 | Santa Clara Commerce Park, 2300 block of Walsh Avenue, Santa Clara Bought | 13 acres, 10 buildings, about 251,000 sq ft | $123m cash | Land across the road from HQ; now proposed for a 692,000 sq ft office building (HQ phase 4). SF Standard, 6 May 2025 |
| Sep 2025 | 2701 San Tomas Expressway, Santa Clara Bought | 125,000 sq ft office building | $83.2m | Fourth and last building of the office park opposite HQ. GovTech/SJ Mercury, 9 Sep 2025 |
| Dec 2025 | Kiryat Tivon employment zone, northern Israel Bought | 90 dunams (about 22 acres) | About NIS 90m (about US$29m) plus infrastructure costs | Site for a 160,000 sq m R&D campus for up to 10,000 staff. Israeli state land is held on long leases. Globes, 16 Dec 2025 |
| Feb 2026 | Beitou-Shilin Technology Park plots T17-T18 (merged), Taipei Rented | Nearly 4 hectares | NT$12.2bn (about US$380m) for 50-year land-use rights, extendable 20 years | Site for the Constellation Taiwan headquarters. Taipei Times, 11 Feb 2026 |
| Feb 2026 | Ofer Park, Yokneam, Israel (new 11-floor building) Reported | 29,000 sq m; Nvidia total in the park about 67,000 sq m | About NIS 230m over 10 years | More office and lab space at the Israeli HQ; building due 2028. Tenant named by market sources, not the landlord. Globes, 6 Feb 2026 |
| Apr 2026 | Memphis South Tower, Bagmane Capital, Bengaluru, India Reported | About 760,000 sq ft, 12 floors | About Rs 1,230 crore over 10 years | Big new engineering office for Nvidia's Indian arm; lease from 1 Apr 2026. Digital Terminal, 29 Apr 2026 |
| Jul 2026 | Gav-Yam High-Tech Park, Beersheva, Israel Rented | About 3,000 sq m | About NIS 2.5m a year, 10-year lease (unnamed sources) | Tripled R&D centre in southern Israel. Globes, 7 Jul 2026 |
| Mar 2025 | Fairbanks Logistics Park, north-west Houston, Texas (bought by Foxconn unit Ingrasys, not Nvidia) Reported | 4 buildings, about 1m sq ft, 86-100 acres | $142m | Partner land: reported site of Foxconn's AI server plant linked to Nvidia's Houston factory plan. Dalfen, 16 Jun 2025 |
| Summer 2025 | Westport 14 (14601 Mobility Way) and 35 Eagle (15200 Heritage Parkway), Fort Worth, Texas (bought by Wistron, not Nvidia) Bought | About 767,000 sq ft and 325,000 sq ft | Not given | Partner land: Wistron bought both to build and test Nvidia AI supercomputers. Dallas Innovates, 21 Jul 2026 |
| Aug 2025 | Peoria Innovation Core, north Peoria, Arizona (Amkor, via land swap with the city) Bought | 104 acres (swapped for a 56-acre plot) | Not given | Partner land: Amkor packaging plant with Nvidia and Apple as named customers. Amkor, 28 Aug 2025 |
Sizes are in acres unless it says otherwise. “Reported” means it comes from news reports or local records, not from Nvidia itself.
Money spent on buildings and equipment
Each quarter, from Nvidia’s cash-flow statements filed with the SEC. It covers factories, data centres, machines and chips the company keeps for itself. Buildings and equipment on its books (after wear and tear): $14.3bn at end of Q2 FY27, up from $9.14bn at end of Q2 FY26.
Building news
- Nvidia RTX GPU vendor Palit denies its Galax factory has closed due to a shortage of chips Tom's Hardware,
- NVIDIA Unveils Minerva to Bring End-to-End Observability for AI Factories Nvidia newsroom,
Headlines about factories, sites and building work, picked from the news feeds on this page.
What’s new
- News Oracle AI World takeaways: making Nvidia envious, and storage... sexy? Data Center Dynamics,
- News Blockchain and crypto firm Blockmate Ventures enters neocloud market with purchase of Nvidia B200 cluster Data Center Dynamics,
- Nvidia NVIDIA RTX Spark Windows Laptops Gain New Models, Agent Tools and Games Nvidia newsroom,
- News Voice AI in vogue: Nvidia releases new open transcription model TechCrunch,
- News Nvidia RTX GPU vendor Palit denies its Galax factory has closed due to a shortage of chips Tom's Hardware,
- News Standalone Nvidia Vera CPUs land in Oracle Cloud's multi-gigawatt deployment Tom's Hardware,
- Video How AI Is Advancing Human Health YouTube,
- Nvidia NVIDIA and Oracle Expand NVIDIA Vera Rubin to Multi-Gigawatt Scale and Bring NVIDIA Vera CPU to Oracle Cloud Infrastructure Nvidia newsroom,
- Nvidia How AI Is Changing the Pace of Discovery for Millions Living With Dementia Nvidia newsroom,
- News TSMC reportedly weighs 20% CoWoS price increase as Nvidia Blackwell and Rubin chips put pressure on packaging capacity Tom's Hardware,
- Video AI in the UK: Drug Discovery, Robotics and AI Factories | NVIDIA YouTube,
- News Nvidia backs Indian startup helping companies run AI models with fewer GPUs TechCrunch,
- News Nvidia is bankrolling AI accelerator supply chain buildout to reserve production capacity Tom's Hardware,
- Nvidia NVIDIA and Meta to Expand Collaboration on Muse and Muse Family of Models Amid Robust Growth Nvidia newsroom,
- Video AI in France: From NVIDIA’s First Chip to AI Factories | NVIDIA YouTube,
- Video How Audi is Reimagining Production With Digital Twins and Physical AI YouTube,
- Video Jensen Huang’s Keynote Highlights at NVIDIA GTC Berlin 2026 YouTube,
- Video NVIDIA GTC Berlin 2026 | Live Keynote Pregame YouTube,
- News Hottest toy for Christmas? Nvidia CEO plays with adorable Microduck robots, 20,000 sell TechCrunch,
- Video NVIDIA Halos SAFE: Autonomous Vehicle Safety Evaluation From Road Testing to Simulation YouTube,
- Video Accelerating Robot Development With AI Agents and NVIDIA Isaac YouTube,
- News Uber rival inDrive eyes 2027 robotaxi tests in Central Asia with Pony AI and Nvidia TechCrunch,
- Nvidia Kazakhstan Expands Compute for Its AI Future Nvidia newsroom,
- Nvidia NVIDIA Unveils Minerva to Bring End-to-End Observability for AI Factories Nvidia newsroom,
- Nvidia Cloud Deployment Incoming: ‘Call of Duty: Modern Warfare 4’ Arrives on GeForce NOW Nvidia newsroom,
- Nvidia Leading European Financial Services Organizations Embrace Open Models to Build Proprietary Intelligence Nvidia newsroom,
- Nvidia NVIDIA Cosmos Opens New Tools to Train, Evaluate and Deploy World Models Nvidia newsroom,
- Nvidia How Companies Are Using NVIDIA DSX to Break the Power Bottleneck Nvidia newsroom,
- Nvidia NVIDIA Transforms European Retail, From Digital Discovery to Physical Operations Nvidia newsroom,
- Nvidia Pioneers Across Europe Deploy NVIDIA Earth-2 Open Models to Power Real-World Weather and Climate Prediction Nvidia newsroom,
- Nvidia NVIDIA Open Models Power a New Wave of European Public Sector Projects Nvidia newsroom,
- Nvidia Bringing the Spark to Europe: Local Intelligence Powers Next Wave of Agents Nvidia newsroom,
- Nvidia Google Cloud and NVIDIA Announce General Availability of NVIDIA Vera Rubin Infrastructure Nvidia newsroom,
- Nvidia NVIDIA and Supply Chain Partners Expand Capacity to Accelerate AI Infrastructure Buildout Nvidia newsroom,
- Nvidia NVIDIA Cloud Partners Scale Across Europe — Sovereign, Open and Built for Safe AI Agents Nvidia newsroom,
- Nvidia Europe’s Industrial Leaders Reinvent Engineering and Manufacturing With NVIDIA Nvidia newsroom,
The last 30 days. Headlines link to the full stories on the publishers’ own sites.
Numbers
Sales each quarter
Net profit each quarter
| Quarter | Months | Sales | Data centres | Everything else | Net profit | Gross margin |
|---|---|---|---|---|---|---|
| Q2 FY27 | May–Jul 2026 | $96.2bn | $89.0bn | $7.20bn | $59.7bn | 75.0% |
| Q1 FY27 | Feb–Apr 2026 | $81.6bn | $75.2bn | $6.37bn | $58.3bn | 74.9% |
| Q4 FY26 | Nov 2025–Jan 2026 | $68.1bn | $62.3bn | $5.81bn | $43.0bn | 75.0% |
| Q3 FY26 | Aug–Oct 2025 | $57.0bn | $51.2bn | $5.79bn | $31.9bn | 73.4% |
| Q2 FY26 | May–Jul 2025 | $46.7bn | $41.1bn | $5.65bn | $26.4bn | 72.4% |
| Q1 FY26 | Feb–Apr 2025 | $44.1bn | $39.1bn | $4.95bn | $18.8bn | 60.5% |
| Q4 FY25 | Nov 2024–Jan 2025 | $39.3bn | $35.6bn | $3.75bn | $22.1bn | 73.0% |
| Q3 FY25 | Aug–Oct 2024 | $35.1bn | $30.8bn | $4.31bn | $19.3bn | 74.6% |
Nvidia's financial year ends in late January, so its “Q2 FY27” is roughly May to July 2026. From Nvidia’s results filed with the SEC; newer quarters appear automatically, with the business split added after each report is checked.
Directors’ share deals
Directors and senior staff must tell the SEC within two business days when they buy, sell or are given shares.
| Reported | Who | What happened |
|---|---|---|
| 13 Oct 2026 | Nicholas P. ParkerEVP, Worldwide Field Ops | Awarded shares 160,418 shares |
| 9 Oct 2026 | Tench CoxeDirector | Gift 500,000 shares |
| 23 Sep 2026 | Timothy S. TeterEVP, General Counsel and Sec | Sold 30,460 shares at $222.80 ($6.8m) |
| 22 Sep 2026 | Mark A StevensDirector | Sold 1,366,000 shares at $219.73 ($300m) |
| 18 Sep 2026 | Scott GawelPrincipal Accounting Officer | Shares kept back for tax 2,932 shares |
| 18 Sep 2026 | Debora ShoquistEVP, Operations | Shares kept back for tax 35,008 shares |
| 18 Sep 2026 | Timothy S. TeterEVP, General Counsel and Sec | Shares kept back for tax 35,738 shares |
| 18 Sep 2026 | Colette KressEVP & Chief Financial Officer | Shares kept back for tax 40,747 shares Sold 34,918 shares at $219.05 ($7.6m) |
From Form 4 filings on SEC EDGAR. ‘Used options’ means turning share options into shares; it is not a purchase on the market.
Share price
Open the full chartChart by TradingView. Prices may be delayed. This page is not investment advice.
Latest videos
How AI Is Advancing Human Health28 Oct 2026
AI in the UK: Drug Discovery, Robotics and AI Factories | NVIDIA27 Oct 2026
AI in France: From NVIDIA’s First Chip to AI Factories | NVIDIA26 Oct 2026
How Audi is Reimagining Production With Digital Twins and Physical AI26 Oct 2026
From Nvidia’s own YouTube channel. Videos open on YouTube.
Timeline
- Oct 2026Launches RTX Spark Windows PCs with Microsoft.
- Sep 2026Adds $150bn to its share buyback, leaving $235bn to spend by early 2028.
- Sep 2026Agrees to buy Hugging Face for $12.9bn.
- Aug 2026Vera Rubin production shipments begin.
- Mar 2026Shows the Feynman chips for 2028 at its GTC conference.
- Dec 2025Licenses Groq's chip technology and hires its staff.
- Oct 2025First company worth $5 trillion.
- Jul 2025First company worth $4 trillion.
- Jun 2024Passes $3 trillion.
- May 2023Worth $1 trillion for the first time.
- Sep 2022H100 (Hopper) in full production.
- Apr 2020Buys Mellanox, the networking business behind its data-centre links.
- 2018RTX graphics cards bring real-time ray tracing.
- 2012AlexNet, trained on Nvidia GPUs, kicks off modern AI.
- 2006CUDA lets GPUs run general programs, not just graphics.
- 1999GeForce 256, which Nvidia called the first GPU.
- Jan 1999Shares listed on Nasdaq.
- Apr 1993Nvidia is founded by Jensen Huang, Chris Malachowsky and Curtis Priem.
On X
Posts worth seeing will be added here. Meanwhile, these are the accounts to follow:
- @nvidia Nvidia's main account
- @NVIDIAGeForce Gaming
- @NVIDIAGTC GTC conferences
- @NVIDIAAIDev AI developers
What do you think?
Share your view on Nvidia with other ChartsView members.
Start an Nvidia thread on the forumWhere this comes from
- US filings, results and insider deals: SEC EDGAR
- Company news: Nvidia newsroom
- Headlines: TechCrunch, Tom's Hardware, The Register and Data Center Dynamics (links to the full stories)
- Videos: Nvidia on YouTube
- Products, cities and timeline: checked by ChartsView against the company’s own reports, last on 8 Oct 2026.
All sources are free and public. Data is collected each morning and refreshed through the day. This page is for information only and is not investment advice.
ChartsView is independent and is not connected with, or endorsed by, NVIDIA Corporation. The company’s name is used only to say who this page is about.